IRAISSA COLLICUTT<br />

Environmental Technologist<br />

Biography<br />

Ms. Collicutt is a recent graduate of the Nova Scotia Community College’s two year<br />

Environmental Engineering Technology – Water Resources program. Over the course of<br />

her two years spent at NSCC, Ms. Collicutt gained an understanding of such areas as<br />

limnology, contaminant hydrogeology, surface and groundwater hydrology, wastewater<br />

treatment and disposal, and groundwater evaluation including aquifer analysis. She<br />

successfully completed a four-day geology field school course, two courses in Computer<br />

Aided Drafting and Design (CADD) and a week long surveying course. Her education with<br />

NSCC also included a four week work experience component that was spent with SLR<br />

Consulting (Canada) Limited. This work experience led to full time employment with SLR.<br />

Project Experience<br />

<strong>Phase</strong> I Environmental Site Assessments<br />

• Project Team Member – Ms. Collicutt was involved in the completion of a <strong>Phase</strong> I<br />

ESA for Ultramar Limited in Shubenacadie, Nova Scotia. She took part in the initial<br />

interview and inspection and also had a large part in the reporting process.<br />

• EDUCATION<br />

• Diploma in Environmental<br />

Engineering Technology –<br />

Water Resources, Nova Scotia<br />

Community College, 2008<br />

• MAIN SPECIALTY<br />

• <strong>Phase</strong> I ESAs<br />

• RELEVANT INDUSTRY<br />

EXPERIENCE<br />

• Surface water sampling<br />

• Aquifer testing and analysis<br />

• Surveying<br />

• Water classification<br />

• Soil classification<br />

• HEALTH & SAFETY TRAINING<br />

• Emergency First Aid and CPR<br />

Level A<br />

• WHMIS<br />

• TDG<br />

• Project Team Member – Raissa helped to conduct a <strong>Phase</strong> I ESA for Lockheed-<br />

Martin and was responsible for conducting interviews with personnel associated with<br />

the subject site. She was responsible for writing, editing and report completion.<br />

• Project Team Member – SLR, with Ms. Collicutt as part of the field staff, undertook a<br />

<strong>Phase</strong> I ESA completed in Kentville, NS. Ms. Collicutt conducted historical research<br />

of the property and aided in property observation.<br />

• Project Team Member – Raissa conducted a <strong>Phase</strong> I ESA on a former service<br />

station in St. Andre, New Brunswick.<br />

<strong>Phase</strong> II Environmental Site Assessments<br />

• Project Team Member – Raissa was involved in the preparation and completion of<br />

the <strong>Phase</strong> II ESA conducted for Ultramar Limited in Shubenacadie, Nova Scotia. She<br />

prepared the health and safety plan for the project and was responsible for ensuring<br />

that all health and safety protocols were followed over the course of the project. She<br />

was present for the drilling and installation of five monitoring wells, and aided in their<br />

development and sampling.<br />

• Project Team Member – Ms. Collicutt took part in a test pit program completed on a<br />

vacant property in Kentville, Nova Scotia. She was responsible for observing the work<br />

completed, sampling, and recording test pit stratigraphy.<br />

Remediation/Decommissioning<br />

• Project Team Member – Ms. Collicutt was involved with the environmental site<br />

assessment completed on CTAS #067 in New Glasgow, Nova Scotia. She took part<br />

in planning the decommissioning of five monitoring wells on site with respect to<br />

adequately sealing potential contaminant pathways, and helped to enforce health and<br />

safety procedures. She was also responsible for aiding in the decommissioning of an<br />

additional monitoring well at the end of the program.<br />