05.01.2014 Views

Phase I - Halifax Regional Municipality

Phase I - Halifax Regional Municipality

Phase I - Halifax Regional Municipality

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Archaeological Resource Impact Assessment<br />

Pre-development Assessment<br />

Spring Garden Road/Queen Street Public Lands Plan<br />

Figure 3.2.2-5: A 1934 plan of Grafton Park.<br />

The Memorial Library was built, as the name suggests, in memory of the dead from both<br />

world wars. The building was designed by Leslie R. Fairn and built by Standard<br />

Construction Company Limited. As Figure 3.2.2-5 illustrates, the Library rests squarely<br />

in the middle of the cemetery, so it is surprising that no human remains were reported<br />

during construction of the building. The plan in Figure 3.2.2-6 also confirms Don<br />

Crowdis’ report that the concrete walkway was moved forward to make way for the<br />

building.<br />

An extension was added to the building in 1975, to allow more space for the library’s<br />

growing book collection. 33 A postcard from two years after the opening of the library<br />

shows that little has changed in the past 55 years on the library property (Plate 10).<br />

33 Mail-Star, 25 November 1975.<br />

Davis Archaeological Consultants Limited 30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!