05.01.2014 Views

Phase I - Halifax Regional Municipality

Phase I - Halifax Regional Municipality

Phase I - Halifax Regional Municipality

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IRAISSA COLLICUTT<br />

Environmental Technologist<br />

• Project Team Member – Ms. Collicutt was a large contributor in the completion of<br />

two reports written for Ultramar Ltd. regarding the decommissioning of two former<br />

service stations in Cape Breton, Nova Scotia.<br />

Hazardous Materials Surveys<br />

• Project Team Member – Raissa helped to conduct a hazardous materials survey on<br />

a former service station building in St. Peter’s, Nova Scotia. She was responsible for<br />

identifying and sampling various types of potentially asbestos-containing material and<br />

sampling all types of paint found in the building.<br />

• Project Team Member – Ms. Collicutt conducted a hazardous materials survey of a<br />

former service station building in Dartmouth, Nova Scotia. She was responsible for<br />

recording all observations on building materials, paints, light ballasts, and appliances<br />

and helped to sample all the different types of materials identified in the building.<br />

Other Project Experience<br />

• Project Team Member – Raissa aided in the process of mapping and scheduling for<br />

an Atlantic province-wide project dealing with water sampling. She then took part in<br />

the sampling of various government buildings in towns across Nova Scotia.<br />

• Project Team Member – SLR undertook the task of completing general chemical<br />

inventories on ten different Department of Fisheries and Oceans locations across<br />

New Brunswick. Raissa identified and recorded all potentially hazardous materials<br />

and units containing ozone-depleting substances in all ten buildings.<br />

• Project Team Member – Raissa conducted groundwater monitoring at a former<br />

service station in St. Andre, New Brunswick. Purging and sampling was completed<br />

using disposable bailers.<br />

• Project Team Member – Ms. Collicutt conducted low-flow sampling from one<br />

monitoring well at a Department of Fisheries and Oceans small crafts harbor in New<br />

Brunswick. She was responsible for recording parameters, observing their<br />

stabilization, and sampling.<br />

• Project Team Member – Ms. Collicutt conducted groundwater monitoring at an<br />

active service station in Sydney, Nova Scotia. She was responsible for purging and<br />

sampling using bailers from ten wells on the property, and also for the replacement of<br />

sorbent socks in four of the wells.<br />

• Project Team Member – Raissa helped in monitoring groundwater using low-flow<br />

method in Sydney, Nova Scotia. The property is heavily impacted and has been<br />

undergoing remediation for several years.<br />

Last Revised: 02-Feb-06 2/2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!