IPCC Expert Meeting on Geoengineering
IPCC Expert Meeting on Geoengineering
IPCC Expert Meeting on Geoengineering
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Annex 5: Breakout Group Reports<br />
Relative Estimated Total Storage Potential<br />
Higher<br />
Lower<br />
Weathering<br />
Direct CO 2<br />
injecti<strong>on</strong><br />
Ocean fertilizati<strong>on</strong><br />
Transboundary<br />
issues<br />
Direct air capture<br />
Afforestati<strong>on</strong>/<br />
reforestati<strong>on</strong><br />
Little transboundary<br />
issues<br />
Biomass burial<br />
Bioenergy with CCS<br />
Biochar<br />
C<strong>on</strong>servati<strong>on</strong> agriculture<br />
Forest<br />
No till agriculture<br />
management<br />
Blue carb<strong>on</strong> Sequestrati<strong>on</strong><br />
in buildings Fertilizati<strong>on</strong><br />
Creati<strong>on</strong> of wetlands of land plants<br />
Carb<strong>on</strong> absorbing cement<br />
Global Regi<strong>on</strong>al Local Local<br />
+ C storage benefit<br />
Project Impact Bey<strong>on</strong>d Climate<br />
Red: Sink creati<strong>on</strong><br />
Black: Emissi<strong>on</strong> reducti<strong>on</strong><br />
Figure A.5.1: The relative estimated total storage potential for emissi<strong>on</strong> reducti<strong>on</strong> and sink creati<strong>on</strong> projects at different<br />
scales.<br />
What are the most important aspects of these approaches to evaluate?<br />
The group’s discussi<strong>on</strong> included the following aspects:<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Feasibility (technical, risks)<br />
Effectiveness (time to maximum deployment, maximum rate of CDR (Gt C/yr); maximum integrated storage<br />
potential (Gt))<br />
Side effects (physical, biological, risks, local and global scale)<br />
Efficiency (direct cost, social costs, including side effects)<br />
Legal and social acceptability<br />
Regulati<strong>on</strong> (ec<strong>on</strong>omic incentives, command and c<strong>on</strong>trol)<br />
M<strong>on</strong>itoring and Verificati<strong>on</strong><br />
Ethics (l<strong>on</strong>g time scales)<br />
The BOG noted that it is important to distinguish whether research or deployment is to be evaluated.<br />
<str<strong>on</strong>g>IPCC</str<strong>on</strong>g> <str<strong>on</strong>g>Expert</str<strong>on</strong>g> <str<strong>on</strong>g>Meeting</str<strong>on</strong>g> <strong>on</strong> <strong>Geoengineering</strong> - 76