guarantee period. All tools and operational spares for day – today operation of the<br />

switchgear should be included in the scope of this offer.<br />

4. WARRANTY<br />

System supplied shall be covered under a warranty period of not less than TWO<br />

years from the date of receipt of the material at our site.<br />

5. SAFETY<br />

All equipment and material shall be designed manufactured and tested in accordance<br />

with the latest applicable Indian Standard, IEC standard.<br />

The electrical installation shall met the requirement of Indian Electrically Rules as<br />

amended up to date relevant IS code of practices and Indian electricity act. In addition<br />

other rules of regulations applicable to the work shall be followed. It shall be the<br />

responsibility of the contractor to comply with all the safety norms and fulfill all the<br />

relevant acts. MCF will not be responsible for any untoward accidents for the party’s<br />

working personnel.<br />

6. WORK INSTRUCTIONS<br />

The qualified technicians shall do the installation works.<br />

Only the qualified electricians shall do the other Electrical works.<br />

The party shall bring all the necessary tools and instruments required for erection,<br />

installation, commissioning and testing.<br />

For all electrical works such as crimping, terminal connections, tinning… etc right<br />

size and proper tools shall be used.<br />

7. WORK SCHEDULE<br />

Preliminary design review (PDR)<br />

PDR document shall be submitted to MCF with in 15 days of receipt of <strong>purchase</strong><br />

order<br />

Submission of PDR after release of PO:<br />

Review and clearance of PDR:<br />

Delivery of materials at site from the date of site clearance:<br />

Erection / Installation:<br />

Testing & Commissioning and acceptance:<br />

Submission of all documentation:<br />

15 Days<br />

10 Days<br />

45 Days<br />

60 Days<br />

30 Days<br />

15 Days<br />

8. DOCUMENTATION<br />

a. Three sets of Operation & Maintenance instruction manual.<br />

b. Three sets of Service manual with detailed power and control wiring diagram,<br />

circuit diagram.<br />

c. Three sets of original Spare parts catalogue with part numbers<br />

d. List of recommended spares.<br />

e. Three sets in original Handing over document & as- build drawings in Auto CAD<br />

with soft copy in CDs<br />

Page 2 of 23