08.03.2014 Views

purchase & stores division - ISRO

purchase & stores division - ISRO

purchase & stores division - ISRO

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Master Control Facility – Hassan<br />

Environmental requirements<br />

: Storage temperature range shall be 0° to + 85°C<br />

: Operating temperature range shall be 0° to 50°C<br />

: Operation shall be reliable in an environment with 0% to 95% noncondensing<br />

RH.<br />

Fabrication<br />

Panel design<br />

: Semi-modular design concept shall be adopted for panel fabrication.<br />

: Free standing, floor mounting and suitable for indoor installation.<br />

: Profile should have holes of standard size punched at standard pitch<br />

throughout the length.<br />

: The L / U / square tubular frame shall be assembled with die casted<br />

corners / tripods or baying clamp for three-dimensional flexibility in design<br />

configuration.<br />

: Mounting plate’s -Mild steel, 2 mm, epoxy polyester powder coated.<br />

: Fixtures for mounting switchgears shall provide flexibility for adjustments in<br />

X, Y & Z-axis.<br />

: The panel shall have easily removable and interchangeable sections.<br />

: Horizontal busbars are to be located at the top of the panel.<br />

: Stainless steel high tensile strength fasteners shall be used for panel.<br />

: Stainless steel fasteners set of high tensile strength (consisting of<br />

hexagonal bolt –1 no, flat washers –2 nos, spring washers –1 no and<br />

hexagonal nut –1 no) shall be provided for each termination point.<br />

: The length of the hexagonal bolt shall be adequate for insertion of 3 lugs of<br />

requisite rating.<br />

: Required service clearances shall be provided to carry out preventive and<br />

remedial maintenance from front and rear side.<br />

: The panel shall be naturally convection-cooled & shall allow continuous<br />

full-load operation, maintaining the temperatures within tolerance level of<br />

components.<br />

: Each bus bar compartment should have a barrier with 1.6 mm thick<br />

galvanized coated & painted with fire resistance paint.<br />

: Proper fixing arrangement shall be made for mounting metering &<br />

protection current transformers.<br />

: The degree of protection for the panel shall be IP 31<br />

Panel dimension<br />

Width<br />

: As per design requirement.<br />

Depth<br />

: Shall not be more than 1200 mm<br />

Height<br />

: Shall not be more than 2400 mm (including plinth)<br />

Plinth<br />

: Shall be 100 / 50 mm height<br />

Ground clearance : Minimum ground clearance for switchgear mounting shall be 350 mm<br />

including plinth.<br />

Weight / Sq. mm : Distributed floor weight shall be less than 1225 kg sq. m.<br />

Switchgears<br />

operation<br />

Plinth<br />

: Switchgears are to be mounted in such a way its handle operation shall<br />

confirm to per IS 4237<br />

-ON Closing –Clockwise i.e., Vertically upward<br />

-OFF Opening –Anti-clockwise i.e., Vertically down ward<br />

: The panel shall be supplied along with base plinth of 100 / 50 –mm height<br />

for each transportable modular section and shall be made of C – channel<br />

forming sectional ‘Box’.<br />

Semi Modular substation LT panel –Specification 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!