7.1 Features:<br />

a. Auto trip on earth fault & fuse failure<br />

b. Mechanical tripped on fault indication.<br />

c. Anti-reflex operating handle.<br />

d. LV Pilot cable box and protection compartment. MV cable box to comply in<br />

accordance with EATS 41-26. Modular construction with removable side sheets<br />

on three sides for better access required during installation & maintenance.<br />

Should have fully interlocked cable test access cover.<br />

e. Cast resin encapsulated bus bars in air. Bus chamber to be of extensible version.<br />

f. Flange bolts accordance with EATS 35-1, (or can be fitted with outgoing cable<br />

box).<br />

g. IP55 outdoor enclosure or better version.<br />

7.2 Switchgears operation : Switchgears are to be mounted in such a way its handle<br />

operation shall confirm to per IS 4237<br />

-ON Closing –Clockwise i.e., Vertically upward<br />

-OFF Opening –Anti-clockwise i.e., Vertically down ward<br />

8.0 Vacuum Circuit Breaker: IP 54 Enclosure<br />

a. The unit shall consist of 11KV, 630Amps VCB (for Controlling transformer),<br />

load breaking and fault breaking type fitted with three 630 Amps continuously<br />

rated Vacuum insulated bus bars and arrangement for cable to the primary side<br />

of the transformer.<br />

b. The circuit breaker shall be suitable for manual closing and opening and also for<br />

provision for remote tripping in future.<br />

c. The operating mechanism shall be direct hand operated trip free with a<br />

mechanically operated indicator, positively coupled to the operating mechanism<br />

to indicate whether the breaker is in the closed or in the open position.<br />

d. Voltage Indication: There should be arrangement to check whether the cable<br />

connecting tot the isolator is live or not.<br />

e. The indications for ON/OFF/EARTH of the Isolator & Breaker Switches should<br />

be visible from outside even with the enclosure.<br />

f. Current Transformer: The Ratio of the CTs shall be suitable for Controlling<br />

transformer as specified. The VA burden of the CTs shall be sufficient to<br />

supply the energy required by the relay for normal operation and tripping of the<br />

circuit breaker.<br />

g. Protection System: The protection system should be provided. It must provide<br />

immediate protection and can detect faults instructing the circuit breaker to trip<br />

in less than 40ms.It must have improved operation and Control with the Relay<br />

settings clearly displayed on the front of the panel.<br />

It shall have the provision for the trip test on circuit breaker. The trip inhibit<br />

facility allows the Relay to be tested without tripping the circuit breaker.<br />

Secondary injection can also be carried out using conventional test equipments.<br />

The switchgear and switchboards shall be designed so that the position of the<br />

different devices is visible to the operator on the front of the switchboard and<br />

operations are visible as well.<br />