TECHNICAL SPECIFICATION FOR 11 kV OUT DOOR SWITCHING UNITS -<br />

(RING MAIN UNIT) RMU<br />

1. SCOPE<br />

The scope of the work includes Supply, Installation, Integration, Testing and<br />

Commissioning of 11 KV compact substation switching units with Remote<br />

monitoring facilities at site with all safety accessories, tools and tackles. The Outdoor<br />

switching yard / Sub-station shall be installed and tested as per IEC 60 – 1330<br />

and shall be confirmed for internal arc test wherever applicable. Operating methods<br />

of Pre-fabricated Load break switch and VCBs which are cable & Bus-bar connected<br />

to be operated from outdoor & indoor / local or remote for alternating current of<br />

primary rated voltage 11kV and for a transformer of maximum power 2 x 1000 kVA<br />

for services frequencies. The Pre-Fabricated LBS RMU cubicles to be situated<br />

outdoor at ground level on a raised platform at Free State condition.<br />

1.1 SPECIAL NOTE:<br />

a. The required substation shall meet the power flow diagram as per enclosed<br />

schematic Drg. No MCF/OL/HT-SLD/2007<br />

b. The scope includes supply of 11 KV Ring Main Unit with VCBs, LBS,<br />

including CTs & PTs, Lightning Arrestors, Control battery, control Panels<br />

protective devices and its inter face to Industrial PCs / SCADA / remote<br />

monitoring system<br />

c. Both incoming, LBSs and VCBs outgoing termination should be suitable for<br />

cable connection with Single / dual run of 3 CORE, 150 / 120 SQ.mm XLPE,<br />

armoured 11KV power cable.<br />

d. There should be explicit provisions of terminals for connecting earth leads.<br />

e. An integrated remote monitoring and control unit with each switchgears should<br />

have facility to interfaced with SCADA / SNMP or RS 485 interface and<br />

necessary software to run under windows operating system (OS) shall be<br />

supplied for M&C.<br />

f. Offer may be made separately for total SCADA system and SNMP or RS 485<br />

interface to PC with necessary software for remote monitoring / control<br />

g. Local metering and indication / Remote Manual operation and monitoring Panel<br />

for the functional and operational status of the switchgear.<br />

h. The details of approvals received from Electricity boards, CPRI, Central and<br />

local inspectorates etc also should be enclosed with the offer.<br />

i. Party should have variable Current injection kit at site for Testing of relays &<br />

other tripping devices. The instrument should be calibrated & certified by Govt.<br />

Approved agency. It shall be the responsibility of the party to test and<br />

demonstrate the safety tripping parameters during CEA & Electrical<br />

Inspectorate. The necessary fees towards CEA & Electrical Inspectorate<br />

inspection will be born by the Dept.<br />

j. Manual over-ride for all Auto system to be provided.<br />

k. Bidder may ask for technical clarification if required. The party has to<br />

provide a point-by-point confirmation of the technical features with<br />

catelogues, specifications and bill of materials provided in the tender. If this<br />