08.03.2014 Views

purchase & stores division - ISRO

purchase & stores division - ISRO

purchase & stores division - ISRO

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Wiring shall be terminated with pin & ring type ferrules with ferrule numbers marked<br />

at both ends of wiring. CT wiring shall be marked with additional distinct Red tags on<br />

both ends. All secondary wiring shall be terminated by using Wago make (cage clamp<br />

type) terminal blocks.<br />

8.9 CABLE BOX<br />

a. The VCB's shall be provided with suitable and identical cable boxes for<br />

connection Single / dual runs of 3 core, 11kv XLPE cables of size up to 240<br />

mm 2 approaching vertical from below. The cable shall be so located at<br />

convenient height to facilitate easy cable jointing/termination work.<br />

b. The access for the isolator cable box shall be from side and the access for the Teeoff<br />

cable box shall be from rear side and distanced of bottom level of wiping<br />

gland from ground shall be maintained at 350 mm (minimum)<br />

c. The cable boxes shall be with detachable front cover for ease of termination &<br />

shall be interlocked with Switch position (i.e. when isolator is in Earth / OFF<br />

position.<br />

d. The design of the cable box shall be such that any type of jointing methods such<br />

as heat shrinkable/push on type /cold shrinkable type termination’s can be<br />

adopted.<br />

8.10 EARTHING<br />

a. All units shall have a special earth bar with a sectional area of not less than 100<br />

mm 2 run along the whole of metal enclosed Switch structure, each end being<br />

connected to the main earthing system where metal cases are used on instruments<br />

these shall be connected to this bar by conductors of not less than 16mm 2 section.<br />

b. A mechanical ‘ON/OFF’ indicator shall be provided on isolators and VCB<br />

breaker to indicate whether Switch is ON of OFF.<br />

8.11 REMOTE MONITORING & CONTROL PANEL<br />

a. A separate remote monitoring and control Panel, Pre Fabricated Make of Elsteel,<br />

BCH or Rittal (PS), only shall be provided with all fixing accessories originally<br />

supplied by the enclosure manufacturer. This panel shall have manual control<br />

features for switching ON /OFF of equipments with indications and suitable<br />

interlocks & feed back.<br />

b. The Panel shall be located around 100 mtrs away from the system. All the<br />

necessary control cables and its integration shall be provided.<br />

8.12 OTHERS<br />

a. All foundation bolts, nuts, washer for installation shall be supplied by the<br />

manufacturer.<br />

b. Removable eye bolts shall be provided to facilitate the handling of the cubicles<br />

c. Labels: All cubicles shall be clearly labeled as required indicating where<br />

necessary for their purpose and “ON” / “OFF” lettered on brass, enamel iron or<br />

other suitable materials. Name plate shall be of Aluminium sheet of 2 mm thick<br />

Page 16 of 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!