08.03.2014 Views

purchase & stores division - ISRO

purchase & stores division - ISRO

purchase & stores division - ISRO

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Trip circuit<br />

Indicating lamps<br />

CTs wiring<br />

MCBs input power<br />

Master Control Facility – Hassan<br />

: ACBs / MCCBs shunt trip power supply shall be taken independently<br />

through MCBs from auxiliary busbars.<br />

: Wiring for presence of input power, ACBs / MCCBs ON / OFF and fault trip<br />

status indication.<br />

: Isolators for digital TVM & shorting links for analog meters shall be used.<br />

: Multiple MCB’s input power supply should be tapped through 125A SDFU<br />

for short circuit protection.<br />

Name plates / stickers<br />

Name plate : Nameplates for Transformers & Generators incomers and each outgoing<br />

feeder outlets shall be provided.<br />

: Each nameplate shall contain feeder no, switchgear rating and<br />

nomenclature.<br />

: Nameplates size, design, and color combination and nomenclature for<br />

each output feeder will be furnished during approval of drawing.<br />

: The approved SLD of the panel shall be screen-printed / computerized<br />

print over an A3 size 2 mm thick aluminum sheet or foam board. It shall be<br />

fixed at top-center of the panel.<br />

Laminated stickers : Laminated stickers of suitable size with good quality adhesive shall be<br />

fixed at each terminal blocks, meters, relays on the inner side for clear<br />

Panel specification<br />

plate<br />

Grounding / Earthing<br />

Type<br />

Panel earth bus<br />

Switchgear<br />

Panel doors<br />

Meters / relays<br />

Inspection / Testing<br />

First stage<br />

inspection<br />

Final inspection &<br />

testing<br />

identification.<br />

: The panel shall have the specification plate as per the IS reference<br />

standard 2675<br />

-Rated voltage AC or DC Hz<br />

-Total number of outgoing ways / feeders<br />

-Rated current of each outgoing feeders<br />

-Number of poles<br />

-Manufacturer name / Trade mark / Address<br />

-Customer PO reference and date<br />

-Year of manufacturing<br />

: Two-point ground in accordance with the recommendations of IEEE<br />

Standard and the requirements of the NEC.<br />

: High-purity electrolyte copper E-Cu 57 busbar of size 50x6 mm should be<br />

run all along the width of the panel at front or rear bottom surface.<br />

: All ACBs and switchgears body shall be earthed by 25x3 mm copper strip.<br />

: Doors shall be earthed, if electrical equipment (meters / relays / lamps)<br />

mounted by a yellow green 2.5 Sq. mm wire lugged at both ends.<br />

: All meters / relays shall be earthed to the profile by a yellow green 2.5 Sq.<br />

mm wire lugged at both ends.<br />

: Mechanical -structural fabrication after approval of GA drawing.<br />

: Verification of components as per PO bill of material.<br />

: Minor modifications in mechanical / electrical changes pointed out by MCF<br />

inspecting officer shall be carried out, if necessary, without additional cost.<br />

: After integration of switchgears and wiring.<br />

: Inspection and testing as per checklist.<br />

: Calibrated testing & measuring instruments are to be used for routine test.<br />

: Any deviations from the specifications or in testing shall be attended &<br />

offered for re-inspection.<br />

Semi Modular substation LT panel –Specification 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!