Exhibit S‐1. Final EIS Document Organization (continued)<br />
Section <strong>and</strong> topics covered<br />
Section 4: Environmental Consequences. This<br />
section presents the environmental consequences of<br />
the No-Action <strong>and</strong> reasonable alternatives, including<br />
preliminary measures to avoid, minimize, or mitigate<br />
impacts.<br />
<strong>Knik</strong> <strong>Arm</strong> Crossing Final EIS<br />
<strong>Summary</strong><br />
New or revised section<br />
Text has been added to clarify project compatibility with<br />
existing l<strong>and</strong> use plans <strong>and</strong> policies.<br />
Updates to tables reporting traffic impacts have been<br />
slightly modified.<br />
Other principal changes include additional information<br />
on hydrology, anadromous fish use of <strong>Knik</strong> <strong>Arm</strong> <strong>and</strong><br />
impacts associated with anadromous fish, <strong>and</strong> the status<br />
of the beluga whale.<br />
Additional mitigation measures have also been included.<br />
Additions/modifications regarding mitigation <strong>and</strong><br />
commitments are also in Exhibit S‐24 in the Final EIS<br />
<strong>Summary</strong>.<br />
Section 5: List of Preparers<br />
Section 6: Draft EIS Distribution<br />
Section 7: Comments <strong>and</strong> Coordination [Scoping].<br />
This section presents a summary of the scoping<br />
activities with agencies, tribes, <strong>and</strong> the public, <strong>and</strong><br />
scoping comments. It also includes information on<br />
Draft EIS comment opportunities.<br />
Section 8: Comments <strong>and</strong> Coordination Following<br />
Approval of the Draft EIS for Public<br />
Availability. This section provides an overview of<br />
notification <strong>and</strong> coordination (meetings <strong>and</strong><br />
correspondence) with agencies, tribes, <strong>and</strong> the public<br />
following the release of the Draft EIS. Comments<br />
received on the Draft EIS—<strong>and</strong> responses to those<br />
comments—are also included in this section.<br />
Additional appendixes support this new section.<br />
Final Section 4(f) Evaluation. Attached to the<br />
Final EIS is a final report on the effects of the action<br />
on those resources afforded protection under<br />
provisions of Section 4(f) of the Department of<br />
Transportation Act of 1966 (as amended), 23 United<br />
States Code (U.S.C.) § 138.<br />
Appendix F: Preliminary Alaska Coastal<br />
Management Program Consistency<br />
Appendix G: Notices of Availability of Draft EIS<br />
<strong>and</strong> Notices of Public Hearing<br />
Appendix H: Public Hearing Material<br />
Appendix I: Public Hearing Transcripts<br />
Appendix J: Records of Other Meetings Held <strong>and</strong><br />
Conclusionary Documents/Correspondence<br />
Appendix K: Draft EIS Comment Database Reports<br />
Appendix L: Comments Submitted on Draft EIS<br />
Appendix M: Wetl<strong>and</strong>s <strong>and</strong> Floodplains Findings<br />
Updates have been made to the “List of Preparers” table.<br />
Additions have been made to the Draft EIS distribution<br />
list.<br />
This section remains largely unchanged.<br />
This is an entirely new section, one that was not<br />
published in the Draft EIS. For readability, this addition is<br />
not displayed in highlighted text.<br />
Additions <strong>and</strong> revisions have been made to the Draft<br />
Section 4(f) Evaluation, primarily related to identification<br />
of the overall least net harm alternative selection <strong>and</strong><br />
mitigation.<br />
Supporting material not published in the Draft EIS has<br />
been added in a series of appendixes.<br />