23.03.2014 Views

FEIS Summary - Knik Arm Bridge and Toll Authority

FEIS Summary - Knik Arm Bridge and Toll Authority

FEIS Summary - Knik Arm Bridge and Toll Authority

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Knik</strong> <strong>Arm</strong> Crossing Final EIS<br />

<strong>Summary</strong><br />

The preliminary design includes plans for<br />

potential future expansion (Phase 2) when<br />

traffic volumes would warrant its completion.<br />

In the Mat-Su, the project’s controlled-access<br />

right-of-way 1 would be large enough to exp<strong>and</strong><br />

to two lanes in each direction, including<br />

accommodations for a pathway.<br />

Proposed right-of-way (Phase: 1 <strong>and</strong> 2), typically 400 to 450 feet wide<br />

Future expansion (Phase 2) Proposed Mat-Su roadway (Phase 1)<br />

Future expansion (Phase 2)<br />

1<br />

a designation that allows intersecting roads or driveways at<br />

only limited points to promote safety <strong>and</strong> travel efficiency<br />

Future pathway<br />

Future two-way<br />

frontage road<br />

Future divided<br />

roadway expansion<br />

Future two-way<br />

frontage road<br />

Point MacKenzie Road Alternative<br />

Sources: Imagery from SMB June 2004<br />

MSB GIS, HDR Inc.<br />

0 0.5 1 Mile<br />

Key Costs <strong>and</strong> Impacts for Mat-Su Approach Alternatives<br />

Costs<br />

Construction<br />

Design, engineering, <strong>and</strong> construction<br />

administration<br />

Contingency<br />

Total (by phase)<br />

(Note that Phase 2 would include<br />

future build-out of project.)<br />

Point MacKenzie Road<br />

Alternative<br />

Phase 1: $33.7M<br />

Phase 2: 31.2M<br />

Phase 1: 4.9M<br />

Phase 2: 4.5M<br />

Phase 1: 7.0M<br />

Phase 2: 11.3M<br />

Phase 1: 45.6M<br />

Phase 2: 47.0M<br />

Northern Access Alternative<br />

(Recommended Alternative)<br />

Phase 1: $34.2M<br />

Phase 2: 28.7M<br />

Phase 1: 5.0M<br />

Phase 2: 4.2M<br />

Phase 1: 7.2M<br />

Phase 2: 10.3M<br />

Phase 1: 46.4M<br />

Phase 2: 43.2M<br />

Controlled-Access Right-of-way (ROW): A designation that allows intersecting roads or driveways at only<br />

limited points to promote safety <strong>and</strong> travel efficiency.<br />

ROW costs $0.8M $0.6M<br />

Affected l<strong>and</strong> parcels 30 28<br />

ROW acquisitions/relocations<br />

Section 4(f) Recreational Properties<br />

Businesses: 0<br />

Residences: 0<br />

Businesses: 0<br />

Residences: 0<br />

Point MacKenzie Recreational Trailhead 0.55 acre of trailhead used 0 acres of trailhead used<br />

Wetl<strong>and</strong>s<br />

Forested 14.2 acres 9.7 acres<br />

Sedge <strong>and</strong> grass 17.3 acres 15.5 acres<br />

Scrub/shrub 5.9 acres 3.3 acres<br />

Total 37.4 acres 28.5 acres<br />

Northern Access Alternative<br />

Sources: Imagery from SMB June 2004<br />

MSB GIS, HDR Inc.<br />

0 0.5 1 Mile<br />

Exhibit S-15 Mat-Su Side Alternatives<br />

Because many impacts are relatively equal, FHWA prefers the Northern Access Alternative for<br />

its consistency with Mat-Su Borough <strong>and</strong> Port MacKenzie planning efforts.<br />

As part of the Recommended Alternative, the Northern Access Alternative:<br />

• will remove through-traffic from Port MacKenzie<br />

• will be more conducive to Port MacKenzie expansion plans<br />

Exhibit S-15. Mat-Su Side Alternatives<br />

S-32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!