-I<br />

Trans-Allegheny Interstate Line Company<br />

Supplemental Direc.t <strong>Testimony</strong> <strong>of</strong> Mark A. Mader<br />

Page 3 <strong>of</strong> 12<br />

TrAILCo Statement No. 10A<br />

1<br />

e<br />

TrAILCo Exhibit No. MpLz/I-6 presents updated TrhIL cost estimates.<br />

2<br />

UPDATED FERC COST ALLOCATION PROCESS<br />

3 Q.<br />

-1<br />

5 A.<br />

6<br />

-<br />

I<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17 Q.<br />

:8<br />

19<br />

10 A.<br />

31<br />

22<br />

PLEASE DESCRIBE THE RECENT FERC ORDERS YOU REFERRED TO<br />

EARLIER.<br />

On April 19: 2007, FERC issued orders in Docket Nos. EL05 121 -000, et d, and ER06-<br />

/---<br />

-<br />

1271-003, e! ai. (“April 19 Orders”) directing that new, centrally-planned facilities<br />

within PJM that operate at or above SO0 kV (such as much <strong>of</strong> the TrAIL facilities) be<br />

M1y allocated on a region-wide “postage stamp’’ basis and that costs for facilities below<br />

500 kV (such as the Prexy 138 kV facilities <strong>of</strong> TrAIL) be allocated baed on a<br />

“beneficiary pays” methodology. Under a region-wide “postage-stamp” raie design. the<br />

costs <strong>of</strong> new, centrally-planned transmission facilities in the PJM region will be allocated<br />

to all LSEs in PJM according to each LSE’s share <strong>of</strong> the regional load. Currently the<br />

XIv--.-- i ~ ~ ”-<br />

_._<br />

” .~ i___<br />

total Allegheny Power zonal load is approximately 6% <strong>of</strong> the total PJM regional load,<br />

This load ratio share is updated atmually. Under a "beneficiary pays” methodology. the<br />

beneficiaries <strong>of</strong> a particular transmission upgrade will be identified and dLrectly slliocated<br />

the costs <strong>of</strong> that upgrade.<br />

HOW DO THE REVENUE REQUIREMEKTS FOR TRAIL DIFFER FROM WHAT<br />

YOU DESCRIBED IN YOUR APRIL 13 TESTLMONY AS X RESC‘LT OF FERC‘S<br />

.@RE 19 ORDERS?<br />

Under the prior methodology, as I pointed out at pages 5 through 10 <strong>of</strong> my April 13<br />

<strong>Testimony</strong>, dl the revenue requirements associated with the non-Presy portrons <strong>of</strong> TrrUL<br />

and the DVP Facilities were allocated to loads outside the Allegheny Power Zone. dde<br />

7.N