Trans-Allegheny Interstate Line Company<br />
Supplemental Direc.t <strong>Testimony</strong> <strong>of</strong> Mark A. Mader<br />
Page 3 <strong>of</strong> 12<br />
TrAILCo Statement No. 10A<br />
1<br />
e<br />
TrAILCo Exhibit No. MpLz/I-6 presents updated TrhIL cost estimates.<br />
2<br />
UPDATED FERC COST ALLOCATION PROCESS<br />
3 Q.<br />
-1<br />
5 A.<br />
6<br />
-<br />
I<br />
8<br />
9<br />
10<br />
11<br />
12<br />
13<br />
14<br />
15<br />
16<br />
17 Q.<br />
:8<br />
19<br />
10 A.<br />
31<br />
22<br />
PLEASE DESCRIBE THE RECENT FERC ORDERS YOU REFERRED TO<br />
EARLIER.<br />
On April 19: 2007, FERC issued orders in Docket Nos. EL05 121 -000, et d, and ER06-<br />
/---<br />
-<br />
1271-003, e! ai. (“April 19 Orders”) directing that new, centrally-planned facilities<br />
within PJM that operate at or above SO0 kV (such as much <strong>of</strong> the TrAIL facilities) be<br />
M1y allocated on a region-wide “postage stamp’’ basis and that costs for facilities below<br />
500 kV (such as the Prexy 138 kV facilities <strong>of</strong> TrAIL) be allocated baed on a<br />
“beneficiary pays” methodology. Under a region-wide “postage-stamp” raie design. the<br />
costs <strong>of</strong> new, centrally-planned transmission facilities in the PJM region will be allocated<br />
to all LSEs in PJM according to each LSE’s share <strong>of</strong> the regional load. Currently the<br />
XIv--.-- i ~ ~ ”-<br />
_._<br />
” .~ i___<br />
total Allegheny Power zonal load is approximately 6% <strong>of</strong> the total PJM regional load,<br />
This load ratio share is updated atmually. Under a "beneficiary pays” methodology. the<br />
beneficiaries <strong>of</strong> a particular transmission upgrade will be identified and dLrectly slliocated<br />
the costs <strong>of</strong> that upgrade.<br />
HOW DO THE REVENUE REQUIREMEKTS FOR TRAIL DIFFER FROM WHAT<br />
YOU DESCRIBED IN YOUR APRIL 13 TESTLMONY AS X RESC‘LT OF FERC‘S<br />
.@RE 19 ORDERS?<br />
Under the prior methodology, as I pointed out at pages 5 through 10 <strong>of</strong> my April 13<br />
<strong>Testimony</strong>, dl the revenue requirements associated with the non-Presy portrons <strong>of</strong> TrrUL<br />
and the DVP Facilities were allocated to loads outside the Allegheny Power Zone. dde<br />
7.N