23<br />
summing much more than 3,000 MW in the region to be supplied by the<br />
Loudoun line; such plants have been proposed and are awaiting approvals<br />
by PJM and the local utilities.<br />
Both KEMA generation "options" are obvious non-starters. KEMA says as much;<br />
consequently, they didn't do any analysis. In particular, KEMA did not consider<br />
the thousands <strong>of</strong> MW <strong>of</strong> generating plants that are now in the eastern-PJM<br />
interconnection study queues, all <strong>of</strong> which are real options. KEMA did not look at<br />
other projects that are or were temporarily on hold, such as CPV Warren. They<br />
did not consider other potential generation, conservation, and efficiency options<br />
that will be called forth by PJM's recently reformed capacity market. Neither did<br />
Dominion. Neither did Allegheny. Neither did PJM.