Vireinia Electric and Power Company<br />

Case No. PUE-2007-00031<br />

Piedmont Environmental Council<br />

Second Set<br />

The foliowing response to fnterrogukxy Question No. 62 <strong>of</strong> the First Set <strong>of</strong><br />

Interrog;ltories and Requests for Production <strong>of</strong> Documents <strong>of</strong> Piedmont Environmental<br />

Council received on May 21,2007 has been prepared under my supervision as it concerns<br />

the PJM R.TEP.<br />

Vice President <strong>of</strong>Plaming<br />

PJM htercowection, L,.L.C.<br />

Qucsfion No. 62<br />

a Were my new generating units, and <strong>of</strong> what capacity, assumed to be built in<br />

Virginia, Mayland, and the Delmarva Peninsula in conducting the 2011,2012, and 20 16<br />

studies?<br />

o, If the answer to subpart (a) is ‘eyes,” then identify those new generating units,<br />

including their assumed Iocation, in-service date, and capacity..<br />

Response:<br />

a<br />

Yes.<br />

b These are the generators not yet in service located in Maryland, Virginia and the<br />

Delrnma Peninsula<br />

Queue<br />

GSl W62<br />

Location<br />

Proiected In- MW Capacitv (C) i<br />

Service Date MW Enerw (?3)<br />

Maryland I 200992 1 640 C<br />

--+<br />

Alt the generators listed above were included in the 2016 basecase. The IUg genemtor<br />

wa5 included in the 201 I, 201.2, and 2016 basecases<br />

DOM 000558