07.04.2014 Views

intermodal solutions for transalpine freight traffic - Alpine Space ...

intermodal solutions for transalpine freight traffic - Alpine Space ...

intermodal solutions for transalpine freight traffic - Alpine Space ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Wolfurt - Verona (bmvit, tyrol)<br />

A pilot project across the Arlberg was elaborated,<br />

based on a study commissioned by bmvit<br />

and Land of Tyrol. Taking into account interviews<br />

with enterprises, <strong>for</strong> the Arlberg-axis, half<br />

a block train was suggested between Wolfurt<br />

(Vorarlberg) and Verona (Veneto), with shunting<br />

in Hall in Tirol. The terminal Wolfurt CCT is<br />

the most suitable terminal <strong>for</strong> this pilot in Vorarlberg,<br />

the full enlargement is expected to be<br />

completed by 2015. The terminal in Verona is<br />

located inthe South of the Brenner-axis with the<br />

largest relevant catchment area. The potential<br />

modal shift is approximately 108,000 t per year.<br />

Physical features:<br />

Departing terminal<br />

Arrival terminal<br />

Distance<br />

Cross-Border(s)<br />

Track technical in<strong>for</strong>mation:<br />

Wolfurt CCT<br />

Verona Quadrante Europa<br />

475km<br />

Brenner (AT-IT)<br />

Single/Double track<br />

double track<br />

Electrified/not electrified<br />

electrified; multisystem-locomotive<br />

Profile<br />

D4 + D2<br />

Maximum length<br />

Wolfurt 550m, Verona 650m<br />

Track speed limits<br />

average speed: 50km/h<br />

Maximum weight<br />

train weight: 1,100 t (average)<br />

Main characteristics:<br />

Frequency<br />

five runs per week in each direction<br />

Pricing Estimation of Price <strong>for</strong> a loading unit<br />

(container/swap body)<br />

Main leg by rail (475km) incl. cargo handling:<br />

€ 249.38/swap body<br />

Train time schedule Departure: from Wolfurt at 17:00; from Verona at 19:00<br />

Arrival: in Verona at 02:00; in Wolfurt at 05:00<br />

Possible loading units (e.g. ISO-containers,<br />

swap-bodies, trailers et.)<br />

Freight/goods transported (allowed)<br />

container, swap-bodies, semi-trailers<br />

general cargo<br />

Course of the connection Wolfurt - Verona.<br />

Source: Own illustration, RVDI<br />

Commercial features:<br />

Handling terminal operators:<br />

Departure Terminal<br />

Arrival Terminal<br />

Further rail bound connections from and to<br />

start respectively end points<br />

Wolfurt: Rail Cargo Austria AG<br />

Verona: Terminali Italia<br />

- Wolfurt toHamburg or Bremerhaven (RCA);<br />

- Hall to Munich, Ulm or Hamburg (TX Logistik);<br />

- Verona to Bari or Bologna, etc. (Cemat), Verona to Nola<br />

(Hupac), Verona to Pomezia (TX Logistik)<br />

44<br />

transitects – final report<br />

DEVELOPING COMBINED TRANSPORT SOLUTIONS 45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!