intermodal solutions for transalpine freight traffic - Alpine Space ...
intermodal solutions for transalpine freight traffic - Alpine Space ...
intermodal solutions for transalpine freight traffic - Alpine Space ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
• Wolfurt - Verona (bmvit, tyrol)<br />
A pilot project across the Arlberg was elaborated,<br />
based on a study commissioned by bmvit<br />
and Land of Tyrol. Taking into account interviews<br />
with enterprises, <strong>for</strong> the Arlberg-axis, half<br />
a block train was suggested between Wolfurt<br />
(Vorarlberg) and Verona (Veneto), with shunting<br />
in Hall in Tirol. The terminal Wolfurt CCT is<br />
the most suitable terminal <strong>for</strong> this pilot in Vorarlberg,<br />
the full enlargement is expected to be<br />
completed by 2015. The terminal in Verona is<br />
located inthe South of the Brenner-axis with the<br />
largest relevant catchment area. The potential<br />
modal shift is approximately 108,000 t per year.<br />
Physical features:<br />
Departing terminal<br />
Arrival terminal<br />
Distance<br />
Cross-Border(s)<br />
Track technical in<strong>for</strong>mation:<br />
Wolfurt CCT<br />
Verona Quadrante Europa<br />
475km<br />
Brenner (AT-IT)<br />
Single/Double track<br />
double track<br />
Electrified/not electrified<br />
electrified; multisystem-locomotive<br />
Profile<br />
D4 + D2<br />
Maximum length<br />
Wolfurt 550m, Verona 650m<br />
Track speed limits<br />
average speed: 50km/h<br />
Maximum weight<br />
train weight: 1,100 t (average)<br />
Main characteristics:<br />
Frequency<br />
five runs per week in each direction<br />
Pricing Estimation of Price <strong>for</strong> a loading unit<br />
(container/swap body)<br />
Main leg by rail (475km) incl. cargo handling:<br />
€ 249.38/swap body<br />
Train time schedule Departure: from Wolfurt at 17:00; from Verona at 19:00<br />
Arrival: in Verona at 02:00; in Wolfurt at 05:00<br />
Possible loading units (e.g. ISO-containers,<br />
swap-bodies, trailers et.)<br />
Freight/goods transported (allowed)<br />
container, swap-bodies, semi-trailers<br />
general cargo<br />
Course of the connection Wolfurt - Verona.<br />
Source: Own illustration, RVDI<br />
Commercial features:<br />
Handling terminal operators:<br />
Departure Terminal<br />
Arrival Terminal<br />
Further rail bound connections from and to<br />
start respectively end points<br />
Wolfurt: Rail Cargo Austria AG<br />
Verona: Terminali Italia<br />
- Wolfurt toHamburg or Bremerhaven (RCA);<br />
- Hall to Munich, Ulm or Hamburg (TX Logistik);<br />
- Verona to Bari or Bologna, etc. (Cemat), Verona to Nola<br />
(Hupac), Verona to Pomezia (TX Logistik)<br />
44<br />
transitects – final report<br />
DEVELOPING COMBINED TRANSPORT SOLUTIONS 45