intermodal solutions for transalpine freight traffic - Alpine Space ...
intermodal solutions for transalpine freight traffic - Alpine Space ...
intermodal solutions for transalpine freight traffic - Alpine Space ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
3.5 pilot projects – accompanied combined transport<br />
Physical features:<br />
3.5.1 Pilot train between lombardy region and austria / eastern europe<br />
• ospitaletto - cervignano (alot, FVg)<br />
Departing terminal<br />
Arrival terminal<br />
Distance<br />
Border crossing(s)<br />
Ospitaletto Terminal<br />
Cervignano Freight Village<br />
290 km<br />
n.a.<br />
Soon on the A4 between Venice and Triest<br />
works <strong>for</strong> the 3rd lane will start. Road <strong>traffic</strong> will<br />
be very difficult. The current situation shows already<br />
(some specific days/some peak hours)<br />
very critical situations. This is an infrastructure<br />
with a high level of pass-through <strong>traffic</strong> (from<br />
Austria and Eastern Europe to Italian destinations<br />
and vice versa). This service (even temporary)<br />
could be a “reorientation” of transport<br />
policy to introduce a new rail cargo service substituting<br />
road <strong>traffic</strong> in a high congested area.<br />
Track technical in<strong>for</strong>mation:<br />
Single/Double track<br />
Electrified/not electrified<br />
Profile<br />
Double track<br />
Electrified<br />
P/C 45 Ospitaletto-Verona<br />
P/C 80 Verona-Cervignano del Friuli<br />
Maximum length<br />
700 m<br />
Track speed limits<br />
Maximum weight<br />
Main characteristics:<br />
Frequency<br />
Six departures per day<br />
Pricing Estimation of Price <strong>for</strong> a loading unit<br />
(container/swap body)<br />
17 Euro train/km<br />
380 Euro/unit<br />
Train time schedule Starting from Ospitaletto: 8, 10, 12, 14, 16, 18<br />
Arrival in Cervignano: 12, 14, 16, 18, 20, 22<br />
Possible loading units (e.g. ISO-containers,<br />
swap-bodies, trailers et.)<br />
Lorries<br />
Freight/goods transported (allowed)<br />
Course of the connection Ospitaletto - Cervignano.<br />
Source: own illustration, RVDI<br />
Commercial features:<br />
Handling terminal operators:<br />
Departure Terminal<br />
Arrival Terminal<br />
Further rail bound connections from<br />
and to start respectively end points<br />
Bertani<br />
Interporto di Cervignano<br />
Both the terminals could be hubs <strong>for</strong> long haul trucks who need to<br />
avoid the A4 congested motorway or need the mandatory stop-time<br />
64<br />
transitects – final report<br />
DEVELOPING COMBINED TRANSPORT SOLUTIONS 65