3.5 pilot projects – accompanied combined transport<br />

Physical features:<br />

3.5.1 Pilot train between lombardy region and austria / eastern europe<br />

• ospitaletto - cervignano (alot, FVg)<br />

Departing terminal<br />

Arrival terminal<br />

Distance<br />

Border crossing(s)<br />

Ospitaletto Terminal<br />

Cervignano Freight Village<br />

290 km<br />

n.a.<br />

Soon on the A4 between Venice and Triest<br />

works <strong>for</strong> the 3rd lane will start. Road <strong>traffic</strong> will<br />

be very difficult. The current situation shows already<br />

(some specific days/some peak hours)<br />

very critical situations. This is an infrastructure<br />

with a high level of pass-through <strong>traffic</strong> (from<br />

Austria and Eastern Europe to Italian destinations<br />

and vice versa). This service (even temporary)<br />

could be a “reorientation” of transport<br />

policy to introduce a new rail cargo service substituting<br />

road <strong>traffic</strong> in a high congested area.<br />

Track technical in<strong>for</strong>mation:<br />

Single/Double track<br />

Electrified/not electrified<br />

Profile<br />

Double track<br />

Electrified<br />

P/C 45 Ospitaletto-Verona<br />

P/C 80 Verona-Cervignano del Friuli<br />

Maximum length<br />

700 m<br />

Track speed limits<br />

Maximum weight<br />

Main characteristics:<br />

Frequency<br />

Six departures per day<br />

Pricing Estimation of Price <strong>for</strong> a loading unit<br />

(container/swap body)<br />

17 Euro train/km<br />

380 Euro/unit<br />

Train time schedule Starting from Ospitaletto: 8, 10, 12, 14, 16, 18<br />

Arrival in Cervignano: 12, 14, 16, 18, 20, 22<br />

Possible loading units (e.g. ISO-containers,<br />

swap-bodies, trailers et.)<br />

Lorries<br />

Freight/goods transported (allowed)<br />

Course of the connection Ospitaletto - Cervignano.<br />

Source: own illustration, RVDI<br />

Commercial features:<br />

Handling terminal operators:<br />

Departure Terminal<br />

Arrival Terminal<br />

Further rail bound connections from<br />

and to start respectively end points<br />

Bertani<br />

Interporto di Cervignano<br />

Both the terminals could be hubs <strong>for</strong> long haul trucks who need to<br />

avoid the A4 congested motorway or need the mandatory stop-time<br />

64<br />

transitects – final report<br />

DEVELOPING COMBINED TRANSPORT SOLUTIONS 65