REFRIGERANT CIRCUIT:<br />

A multiple orifice control system consisting of an expansion valve <strong>and</strong> a fixed orifice, maintains<br />

refrigerant flow.<br />

MAIN CONTROL PANEL:<br />

Factory mounted main control panel is to provided with all starters, phase indicating lights, voltmeter<br />

pressure cutouts, safety switches, pre wired <strong>and</strong> factory tested etc. should be weather protected with<br />

IP- 55 protection.<br />

SELECTION OF WATER CHILLING UNIT:<br />

The Water chilling unit should be selected <strong>for</strong> the duty as specified in schedule of equipment.<br />

INSTALLATION:<br />

The chilling machine shall be installed over a cement concrete plat<strong>for</strong>m on flooring <strong>and</strong> shall be<br />

adequately isolated as per manufacturers recommendations against transmission of vibration to the<br />

building structure. For open type units, special attention shall be paid to the alignment of the drive <strong>and</strong><br />

driven shaft, final alignment shall be checked at the site<br />

in the presence of the contractor sing dial indicator.<br />

PAINTING:<br />

The Indigenous Air-cooled water Chilling machine shall be finished with durable enamel paint. The<br />

shop coats of paint that have become marred during shipment or erection, shall be cleared of win<br />

mineral spirit, wire bushed <strong>and</strong> spot primed over the effected areas, than be coated with enamel<br />

paint.<br />

PERFORMANCE RATING:<br />

The unit shall be selected <strong>for</strong> the lowest operating noise level. Capacity ratings, <strong>and</strong> power<br />

consumption with operating points clearly indicated, shall be submitted <strong>and</strong> verified at the time of<br />

testing <strong>and</strong> commissioning of the installation. The architects / consultant / clients representatives shall<br />

witness the capacity tests if need be at manufacturers works <strong>and</strong> all costs towards to <strong>and</strong> <strong>for</strong> air fare,<br />

lodging <strong>and</strong> boarding expenses shall be borne by the client.<br />

Power consumption shall be computed from measurements of incoming voltage <strong>and</strong> input current <strong>and</strong><br />

energy measure meters.<br />

TESTING:<br />

a) Unit capacity in tons refrigeration, shall be computed from the temperature reading <strong>and</strong> water flow<br />

measurements. Flow measurements shall be through flow meters. Computed results shall tally<br />

with the specified capacities as furnished with tender.<br />

b) All instruments, services needed <strong>for</strong> the test required <strong>for</strong> the computation of capacities <strong>and</strong> power<br />

consumption shall be provided by the contractors themselves. All instruments shall be calibrated<br />

<strong>and</strong> contracts shall produce calibration certificate in support.<br />

c) <strong>Tender</strong>er shall furnish detailed certificates of tests carried out on test bed in the factory.<br />

d) The total frame of air-cooled chillers should be well protected by epoxy or equivalent coating to<br />

take care of coastal installation <strong>and</strong> high sulphur contents in atmosphere to avoid corrosion.