a) Double fire retardant Canvass Connection.<br />

b) 12 mm thick cleanable aluminum filters with aluminum frame.<br />

c) Strainer with ball valve at inlet & ball valve at outlet.<br />

d) Balancing valve in return chilled water line.<br />

e) Copper connections between chilled water lines, controls etc.<br />

f) Electrical wiring between motors.<br />

It may be noted that all accessories specified above shall be provided along with the Fan Coil Unit<br />

<strong>and</strong> shall be included in the price of Fan Coil Unit.<br />

Each Fan Coil Unit shall be tested at factory <strong>and</strong> complete in all respects. The sound level of the unit<br />

should not exceed 40 dB. The test certificate shall be furnished with each Coil Unit. It is necessary to<br />

design the fan coil unit in a way to have silent operation. The Fan Coil Unit shall be powder coated<br />

both internally <strong>and</strong> externally.<br />

DESIGN PARAMETERS OF FAN COIL UNITS:<br />

The design parameters of Fan Coil Units are given below:<br />

FAN COIL UNIT - CEILING SUSPENDED:<br />

a) Capacity<br />

b) Air quantity CMH<br />

c) Fan Static pressure<br />

d) Face area of cooling Coil (SMT) minimum<br />

e) No. of fins / cm<br />

f) No. of rows deep<br />

1.0TR 1.5 TR 2.0 TR 2.5 TR 3.0 TR<br />

680 1020 1360 1700 2040<br />

------------------------- 10MM-------------------------<br />

0.129 0.17 0.23 0.293 0.325<br />

---------------------------- 4.70 -------------------------<br />

3 3 4 4 4<br />

g) Motor HP (Single Phase) ----------------- To suit the requirement ------------------<br />

h) 22 G SS Insulated tray -----------------------------YES ---------------------------------<br />

i) Type of painting ----------------------Powder coated finish only-------------<br />

TESTING:<br />

The fan coil units shall be tested as per Per<strong>for</strong>ma Test Readings.<br />

THERMAL / ACOUSTIC INSULATION:<br />

This section deals with supply <strong>and</strong> fixing of thermal / acoustic insulation of ducts, pipes etc. as per<br />

the specification given in this section.<br />

MATERIAL OF INSULATION:<br />

The insulation material of the following kind shall be used <strong>for</strong> cold insulation.