2. TECHNICAL<br />
2.1 Scintillator and Fiber<br />
2.1.1 Findings<br />
The Committee was impressed with the competence, depth of knowledge, and extensive<br />
experience of the scintillator team in performing physics experiments with LS and WLSF. This<br />
experience and expertise was obtained in previous, successful experiments, such as the Main<br />
Injector <strong>Neutrino</strong> Oscillation Search (MINOS), the <strong>Neutrino</strong>s at Tevatron experiment (NuTeV),<br />
and the Monopole Astrophysics and Cosmic Ray Observatory (MACRO). The proposed NOνA<br />
conceptual design for the LS and WLSF is a natural extension of this work.<br />
The conceptual designs are excellent and satisfy the NOνA performance requirements.<br />
In particular, the composition, preparation, and performance of the LS and WLSF have been well<br />
studied and researched. Also well understood are the blending of the LS components, the testing<br />
and quality control associated with each step in the blending procedures that lead to the final LS<br />
mixture, the transport of the LS to the far-detector site, and the loading of the detectors at the far<br />
and near sites.<br />
The scintillator team is properly addressing various environmental safety and health (ES&H)<br />
issues, such as fire prevention and prevention of LS release into the environment. The present cost<br />
and schedule estimates seem to be reasonable; the costs of several major components are based on<br />
quotations from oil and fiber vendors.<br />
2.1.2 Comments<br />
The conceptual designs for the WLSF and especially for the LS are meticulous and<br />
detailed more than what is required for CD-1. Nevertheless, further R&D is required over the<br />
next year to finalize the specifications for the WLSF. The WLSF delivery schedule is on the<br />
critical path and the cost of the WLSF has increased significantly in recent months. It is prudent<br />
to explore proposals from more than one vendor.<br />
For future CD-2/CD-3, Approve Start of Construction, reviews, it will be important to<br />
complete the following actions:<br />