4. COST ESTIMATE<br />
4.1 Findings<br />
The cost estimate for the NOνA construction project was developed using a<br />
comprehensive task oriented WBS summarized below:<br />
Table 4-1.<br />
NOνA Work Breakdown Structure<br />
WBS 2.1<br />
WBS 2.2<br />
WBS 2.3<br />
WBS 2.4<br />
WBS 2.5<br />
WBS 2.6<br />
WBS 2.7<br />
WBS 2.8<br />
WBS 2.9<br />
WBS 2.10<br />
Far Detector Site and Building<br />
Liquid Scintillator<br />
Wave-Length Shifting Fiber<br />
PVC Extrusions<br />
PVC Modules<br />
Electronics Modules<br />
Data Acquisition Strategy<br />
Near Detector Assembly<br />
Far Detector Assembly<br />
Project Management<br />
Included in the project’s Total Project Cost (TPC) was WBS 1.X, R&D and Project<br />
Engineering and Design (PED) estimates. The project team presented a TPC range between<br />
$197-256 million (actual year [AY]) for the NOνA project. The best estimate was $247 million<br />
(AY), which includes 35 percent (approximately $64 million) contingency.<br />
The project’s cost and schedule estimates were presented down to WBS Level 5 in most<br />
areas, with some areas to Level 8. Quotations and other pricing were compiled to establish a<br />
base cost in FY 2006 budget. The Project <strong>Off</strong>ice will centrally manage the project controls<br />
software (Open Plan and COBRA). A summary of the NOνA preliminary estimate of project<br />
costs is shown in Table 4-2.<br />