4. COST ESTIMATE<br />

4.1 Findings<br />

The cost estimate for the NOνA construction project was developed using a<br />

comprehensive task oriented WBS summarized below:<br />

Table 4-1.<br />

NOνA Work Breakdown Structure<br />

WBS 2.1<br />

WBS 2.2<br />

WBS 2.3<br />

WBS 2.4<br />

WBS 2.5<br />

WBS 2.6<br />

WBS 2.7<br />

WBS 2.8<br />

WBS 2.9<br />

WBS 2.10<br />

Far Detector Site and Building<br />

Liquid Scintillator<br />

Wave-Length Shifting Fiber<br />

PVC Extrusions<br />

PVC Modules<br />

Electronics Modules<br />

Data Acquisition Strategy<br />

Near Detector Assembly<br />

Far Detector Assembly<br />

Project Management<br />

Included in the project’s Total Project Cost (TPC) was WBS 1.X, R&D and Project<br />

Engineering and Design (PED) estimates. The project team presented a TPC range between<br />

$197-256 million (actual year [AY]) for the NOνA project. The best estimate was $247 million<br />

(AY), which includes 35 percent (approximately $64 million) contingency.<br />

The project’s cost and schedule estimates were presented down to WBS Level 5 in most<br />

areas, with some areas to Level 8. Quotations and other pricing were compiled to establish a<br />

base cost in FY 2006 budget. The Project <strong>Off</strong>ice will centrally manage the project controls<br />

software (Open Plan and COBRA). A summary of the NOνA preliminary estimate of project<br />

costs is shown in Table 4-2.<br />