RIPARIAN CORRIDOR MANAGEMENT | continued<br />

Indica<strong>to</strong>r<br />

descrip<strong>to</strong>r<br />

Indica<strong>to</strong>r<br />

Length of in-stream breaks resulting from<br />

<strong>Landcom</strong>’s design for Category 3 – low<br />

significance streams<br />

Conservation of 10m for any first order<br />

watercourse where <strong>the</strong>re is a defined channel<br />

and where water flows intermittently<br />

5-10m setback from <strong>to</strong>p of bank for Category<br />

3 – low significance streams<br />

Appropriate Riparian Corridor Management<br />

Plans developed for all <strong>Landcom</strong> projects where<br />

riparian land exists<br />

Area of riparian land in environment protection<br />

zoning<br />

Area <strong>to</strong> be zoned for environmental<br />

conservation<br />

Ramsar wetlands or o<strong>the</strong>r significant or listed<br />

water bodies affected by <strong>Landcom</strong>’s activities<br />

Target<br />

2009/2010<br />

<strong>to</strong><br />

2014/2015<br />

Result<br />

2010/2011<br />

Result<br />

2009/2010<br />

Target<br />

2002/2003<br />

<strong>to</strong><br />

2008/2009<br />

2008/2009 2007/2008 2006/2007<br />

N/A N/A N/A No target Nil Nil N/A<br />

100% 100%<br />

None<br />

recorded<br />

No data – indica<strong>to</strong>r introduced in<br />

2009/2010<br />

N/A N/A N/A 100% 100% 100% N/A<br />

100% 100% 100% 100% 100% 100% 100%<br />

No target 2.9ha 6.3ha<br />

No data – indica<strong>to</strong>r introduced in<br />

2009/2010<br />

N/A N/A N/A No target Nil 8.8ha Nil<br />

No target<br />

No Ramsar<br />

wetlands<br />

recorded<br />

None<br />

recorded<br />

No target 1 1 Nil<br />

Only one project, Edmondson Park, was included in this year’s<br />

results, since North Penrith, our o<strong>the</strong>r relevant masterplanned<br />

project, requires no riparian corridor management (because it<br />

has no riparian corridor).<br />

Where applicable, all targets were met. Indica<strong>to</strong>rs relating <strong>to</strong><br />

third order or greater streams were not applicable this year,<br />

because <strong>the</strong>re were no such streams identified within <strong>the</strong><br />

project area.<br />

Our riparian zone and vegetation buffer targets were met.<br />

A 20m core riparian zone and 10m buffer will be maintained.<br />

Maxwell’s Creek, a second order stream, is heavily wooded<br />

in <strong>the</strong> upper catchment. There is a large spillway and culverts<br />

that prevent <strong>the</strong> passage of fish and o<strong>the</strong>r aquatic species<br />

in<strong>to</strong> <strong>the</strong> lower reaches. Erosion is evident and <strong>the</strong>re is sewage<br />

discharge from <strong>the</strong> Ingleburn sewage treatment plant that has<br />

contributed <strong>to</strong> reduced water quality.<br />

Within <strong>the</strong> project site, <strong>the</strong> creek line has variable cover of<br />

native vegetation and permanent water. Maxwell’s Creek’s<br />

tributaries are highly modified and as a consequence, <strong>the</strong>re is<br />

little or no permanent flowing water <strong>to</strong> provide a habitat for<br />

fish.<br />

An appropriate riparian corridor management plan for<br />

Edmondson Park will ensure that barriers <strong>to</strong> fish passage are<br />

removed and replaced with appropriate structures, <strong>the</strong> area is<br />

revegetated <strong>to</strong> provide habitat for native flora and fauna, <strong>the</strong><br />

water quality is improved and bank erosion is prevented. In<br />

addition, bank and stream channels will be rehabilitated where<br />

<strong>the</strong>se have been impacted by land use.<br />

There were no in-stream breaks resulting from <strong>Landcom</strong>’s<br />

design for second order streams in this reporting period.<br />

One first order watercourse, 494m long, will be in-filled for<br />

development and <strong>the</strong>re are 2.9ha of riparian land zoned<br />

for environmental protection. There are no Ramsar or o<strong>the</strong>r<br />

important wetlands in <strong>the</strong> Edmondson Park area.<br />

42<br />

landcom annual report 2011