RIPARIAN CORRIDOR MANAGEMENT | continued<br />
Indica<strong>to</strong>r<br />
descrip<strong>to</strong>r<br />
Indica<strong>to</strong>r<br />
Length of in-stream breaks resulting from<br />
<strong>Landcom</strong>’s design for Category 3 – low<br />
significance streams<br />
Conservation of 10m for any first order<br />
watercourse where <strong>the</strong>re is a defined channel<br />
and where water flows intermittently<br />
5-10m setback from <strong>to</strong>p of bank for Category<br />
3 – low significance streams<br />
Appropriate Riparian Corridor Management<br />
Plans developed for all <strong>Landcom</strong> projects where<br />
riparian land exists<br />
Area of riparian land in environment protection<br />
zoning<br />
Area <strong>to</strong> be zoned for environmental<br />
conservation<br />
Ramsar wetlands or o<strong>the</strong>r significant or listed<br />
water bodies affected by <strong>Landcom</strong>’s activities<br />
Target<br />
2009/2010<br />
<strong>to</strong><br />
2014/2015<br />
Result<br />
2010/2011<br />
Result<br />
2009/2010<br />
Target<br />
2002/2003<br />
<strong>to</strong><br />
2008/2009<br />
2008/2009 2007/2008 2006/2007<br />
N/A N/A N/A No target Nil Nil N/A<br />
100% 100%<br />
None<br />
recorded<br />
No data – indica<strong>to</strong>r introduced in<br />
2009/2010<br />
N/A N/A N/A 100% 100% 100% N/A<br />
100% 100% 100% 100% 100% 100% 100%<br />
No target 2.9ha 6.3ha<br />
No data – indica<strong>to</strong>r introduced in<br />
2009/2010<br />
N/A N/A N/A No target Nil 8.8ha Nil<br />
No target<br />
No Ramsar<br />
wetlands<br />
recorded<br />
None<br />
recorded<br />
No target 1 1 Nil<br />
Only one project, Edmondson Park, was included in this year’s<br />
results, since North Penrith, our o<strong>the</strong>r relevant masterplanned<br />
project, requires no riparian corridor management (because it<br />
has no riparian corridor).<br />
Where applicable, all targets were met. Indica<strong>to</strong>rs relating <strong>to</strong><br />
third order or greater streams were not applicable this year,<br />
because <strong>the</strong>re were no such streams identified within <strong>the</strong><br />
project area.<br />
Our riparian zone and vegetation buffer targets were met.<br />
A 20m core riparian zone and 10m buffer will be maintained.<br />
Maxwell’s Creek, a second order stream, is heavily wooded<br />
in <strong>the</strong> upper catchment. There is a large spillway and culverts<br />
that prevent <strong>the</strong> passage of fish and o<strong>the</strong>r aquatic species<br />
in<strong>to</strong> <strong>the</strong> lower reaches. Erosion is evident and <strong>the</strong>re is sewage<br />
discharge from <strong>the</strong> Ingleburn sewage treatment plant that has<br />
contributed <strong>to</strong> reduced water quality.<br />
Within <strong>the</strong> project site, <strong>the</strong> creek line has variable cover of<br />
native vegetation and permanent water. Maxwell’s Creek’s<br />
tributaries are highly modified and as a consequence, <strong>the</strong>re is<br />
little or no permanent flowing water <strong>to</strong> provide a habitat for<br />
fish.<br />
An appropriate riparian corridor management plan for<br />
Edmondson Park will ensure that barriers <strong>to</strong> fish passage are<br />
removed and replaced with appropriate structures, <strong>the</strong> area is<br />
revegetated <strong>to</strong> provide habitat for native flora and fauna, <strong>the</strong><br />
water quality is improved and bank erosion is prevented. In<br />
addition, bank and stream channels will be rehabilitated where<br />
<strong>the</strong>se have been impacted by land use.<br />
There were no in-stream breaks resulting from <strong>Landcom</strong>’s<br />
design for second order streams in this reporting period.<br />
One first order watercourse, 494m long, will be in-filled for<br />
development and <strong>the</strong>re are 2.9ha of riparian land zoned<br />
for environmental protection. There are no Ramsar or o<strong>the</strong>r<br />
important wetlands in <strong>the</strong> Edmondson Park area.<br />
42<br />
landcom annual report 2011