to download the PDF - Landcom - NSW Government
to download the PDF - Landcom - NSW Government
to download the PDF - Landcom - NSW Government
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Influencing design<br />
The thinking behind our indica<strong>to</strong>rs<br />
INFLUENCING DESIGN<br />
Influencing design is about ‘walking <strong>the</strong> talk’ and introducing<br />
a sustainability culture in<strong>to</strong> our own projects so we can, in turn,<br />
influence broader development outcomes. The <strong>to</strong>ols we use<br />
<strong>to</strong> achieve this are <strong>the</strong> <strong>Landcom</strong> Guidelines, which provide<br />
direction on how <strong>to</strong> achieve high quality and sustainable home<br />
and neighbourhood designs.<br />
Our aim is for all our projects <strong>to</strong> take <strong>the</strong> <strong>Landcom</strong> Guidelines<br />
in<strong>to</strong> account during <strong>the</strong> planning and design phase.<br />
Fur<strong>the</strong>rmore, all lots that have sustainable design criteria<br />
should have two of <strong>the</strong> following:<br />
Indica<strong>to</strong>r<br />
descrip<strong>to</strong>r<br />
Influencing<br />
design<br />
Indica<strong>to</strong>r<br />
Number of projects where <strong>Landcom</strong> influences<br />
<strong>the</strong> builders’ product by specifying design<br />
criteria<br />
Percentage of lots delivered where <strong>the</strong> builders’<br />
designs were influenced by <strong>Landcom</strong> through<br />
design guidelines<br />
Target<br />
2009/2010<br />
<strong>to</strong><br />
2014/2015<br />
No target<br />
Result<br />
2010/2011<br />
10 of 10<br />
projects<br />
Result<br />
2009/2010<br />
9 of 9<br />
projects<br />
Target<br />
2002/2003<br />
<strong>to</strong><br />
2008/2009<br />
No target<br />
2008/2009 2007/2008 2006/2007<br />
6 out of 6<br />
projects<br />
8 out of 8<br />
projects<br />
3 out of 4<br />
projects<br />
No target 100% 100% No target 100% 94% 98%<br />
••<br />
solar orientation and passive solar design<br />
••<br />
energy efficient design (6 star <strong>the</strong>rmal performance)<br />
Percentage (and number) of projects where <strong>the</strong><br />
<strong>Landcom</strong> Guidelines were used <strong>to</strong> influence<br />
urban outcomes<br />
100%<br />
60%<br />
(6 of 10<br />
projects)<br />
56%<br />
(5 of 9<br />
projects)<br />
No data – indica<strong>to</strong>r introduced in<br />
2009/2010<br />
••<br />
water conservation measures (4 star rated taps, shower<br />
roses, fittings and fixtures, <strong>to</strong>ilets)<br />
••<br />
household recycling facilities.<br />
How we performed<br />
While 60% or six out of 10 projects used <strong>the</strong> <strong>Landcom</strong><br />
Guidelines, Garden Gates, Spring Farm, The Ponds Stage<br />
3 and Vantage are all projects that pre-date <strong>the</strong> guidelines,<br />
giving rise <strong>to</strong> <strong>the</strong> recorded result.<br />
With regard <strong>to</strong> sustainable design criteria in solar, energy, water<br />
and recycling, 100% or 1,048 lots included two or more of <strong>the</strong>se<br />
criteria in <strong>the</strong>ir design guidelines. This is an improvement over<br />
last year’s figure of 93%.<br />
Percentage of lots delivered that had<br />
sustainable design criteria in design guidelines,<br />
comprising two out of four of <strong>the</strong> following<br />
sustainability criteria:<br />
(a) solar orientation and passive solar design<br />
(b) energy efficient design<br />
(i.e. 6 star <strong>the</strong>rmal performance)<br />
(c) water conservation measures<br />
(i.e. 4 star rated fittings and fixtures)<br />
(d) household recycling facilities<br />
100% 100% 93%<br />
No data – indica<strong>to</strong>r introduced in<br />
2009/2010. Previously, <strong>the</strong> indica<strong>to</strong>r was<br />
defined as Percentage of lots delivered<br />
that had sustainable design criteria in<br />
design guidelines, comprising two out of<br />
four of <strong>the</strong> following sustainability criteria:<br />
––<br />
solar orientation and passive solar<br />
design<br />
––<br />
energy efficient design (i.e. 4.5 star<br />
NatHERS (Nationwide House Energy<br />
Rating Scheme)<br />
––<br />
water conservation measures (i.e.<br />
AAA-rated shower roses, 3/6-litre flush<br />
<strong>to</strong>ilets)<br />
––<br />
waste minimisation and ongoing<br />
recycling facilities.<br />
This was <strong>the</strong>n superseded by BASIX, so<br />
data collection was no longer required.<br />
For projects where we only sell land, we can normally only<br />
influence <strong>the</strong> built form by encouraging <strong>the</strong> use of <strong>the</strong><br />
<strong>Landcom</strong> Guidelines. This year, 100% of projects have design<br />
guidelines – or 10 out of 10 of <strong>the</strong> projects delivering land only.<br />
This is equivalent <strong>to</strong> 1,048 lots being influenced by <strong>Landcom</strong>’s<br />
preferred design outcomes.<br />
Percentage of <strong>Landcom</strong> projects applying <strong>the</strong> <strong>Landcom</strong> Guidelines<br />
100%<br />
90%<br />
80%<br />
Percentage of <strong>Landcom</strong> projects applying <strong>the</strong> <strong>Landcom</strong> Guidelines<br />
100%<br />
90%<br />
80%<br />
It is pleasing <strong>to</strong> see that <strong>the</strong> steps we <strong>to</strong>ok last year <strong>to</strong><br />
improve results, including introducing a refresher course<br />
on sustainability within <strong>the</strong> organisation and enhancing<br />
existing communication and information systems <strong>to</strong> improve<br />
knowledge about sustainability requirements, appear <strong>to</strong> have<br />
paid off.<br />
70%<br />
60%<br />
50%<br />
40%<br />
30%<br />
20%<br />
10%<br />
0%<br />
2009/2010 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015<br />
70%<br />
60%<br />
50%<br />
40%<br />
30%<br />
20%<br />
10%<br />
0%<br />
2009/2010 2010/2011<br />
Result<br />
2015 Target<br />
Result<br />
Target<br />
44<br />
landcom annual report 2011