Estimated Cost ($M)<br />
Immediately Actionable Projects<br />
3 rd Leeds – Pleasant Valley 345kV Line $ 207<br />
Marcy South Series Compensation and Fraser – Coopers Corners Reconductoring $ 65<br />
2 nd Rock Tavern-Ramapo 345kV Line $ 113<br />
Sub-Total: $ 385<br />
Actionable Projects<br />
Marcy – <strong>New</strong> Scotland 345kV Line $ 386*<br />
3 rd <strong>New</strong> Scotland – Leeds 345kV Line $ 96<br />
Oakdale – Fraser 345kV Line Upgrade $ 205*<br />
Moses – Marcy 230kV to 345kV Upgrade $ 1,035*<br />
Sub-Total: $ 1,722<br />
Projects to Address Potential Indian Point/Downstate Generation Retirement<br />
<strong>Transmission</strong> to Un-bottle Staten Island Generation $ 300<br />
East Garden City - <strong>New</strong>bridge 345kV Upgrade $ 70<br />
Sub-Total: $ 370<br />
Projects to Enable Wind Generation<br />
Canandaigua – Hillside and Hillside – Watercure Road 230kV Lines Reconfiguration $ 1<br />
Montour Falls – Hillside 115kV Line Reconductoring $ 20<br />
Hillside – North Waverly 115kV Line Reconductoring $ 18<br />
Canandaigua – Avoca – Hillside 230kV Line Reconductoring $ 66<br />
Delhi – Colliers 115kV Line Reconductoring $ 20<br />
Bennett – Howard – Bath – Montour Falls 115kV Line Reconductoring $ 48<br />
Bennett – Moraine Road – Meyer 115kV Line Reconductoring $ 22<br />
Meyer – Eelpot Rd – Ecogen – Flat St. – Greenidge 115kV Line Reconductoring $ 41<br />
Coffeen St-Adirondack <strong>New</strong> 345kV Line $ 199<br />
Sub-Total: $ 435<br />
* The estimated project costs include costs to be spent by both the NY Transco and the host NYTO.<br />