3 rd Leeds - Pleasant Valley 345kV Line<br />
Immediately Actionable Project<br />
Project Description:<br />
Build one new 40 mile 345kV line between National Grid’s Leeds and Con Ed’s Pleasant Valley station.<br />
The transmission line will traverse Greene, Columbia, and Dutchess Counties. It will utilize the existing<br />
right of way corridor requiring a slight increase in width. It will be single circuit construction utilizing<br />
bundled 1590 ACSR (2 x 1590 ACSR). Both terminals of the project are located in NYISO Zone G.<br />
Project Size:<br />
Length: 40 miles<br />
Voltage: 345 kV<br />
Anticipated Rating: 1986 MVA (summer normal)<br />
Terminal Stations and required upgrades:<br />
1. Add one line position at the Leeds Station.<br />
2. Add one new line position at Pleasant Valley<br />
3. Re-conductor the Feura Bush-N. Catskill #2 line using 795ACSR. This existing 115kV line traverses<br />
Albany and Greene counties for 24 miles. This will increase the line rating by 116MVA/220MVA<br />
(summer/winter @ 115kV).<br />