Bennett-Moraine Road-Meyer 115 kV Line Reconductoring<br />
Project to Enable Wind Generation<br />
Project Description:<br />
Reconductor the existing 115 kV line from Bennett Substation to Moraine Road Substation to Meyer<br />
Substation with a conductor sized to no less than double 1033 ACSR or equivalent (2500A summer<br />
normal). The existing line extends from the City of Hornell (Steuben County) to the Village of Dansville<br />
(Livingston County). All terminals of the project are located in NYISO Zone C.<br />
Project Size:<br />
Length: 19.3 miles<br />
Voltage: 115kV<br />
Anticipated rating (summer normal): 2500 A<br />
Terminal Stations and required upgrades:<br />
The terminal substations are Bennett and Meyer. The 115 kV buswork, breakers, and switches, and CTs at<br />
Bennett and Meyer Substations will need to be upgraded to match the capacity of the 2-1033 ACSR<br />
conductor.<br />
45