Immediately Actionable Projects<br />

Immediately Actionable Projects provide a broad range of benefits and are distinguished from the<br />

Actionable Projects for several reasons: (1) they have had more detailed engineering evaluations<br />

completed, (2) they are needed in order to achieve many of the benefits associated with the<br />

Actionable Projects; (3) they have the ability to mitigate reliability needs that may occur as a result of<br />

the retirement of downstate generators including Indian Point; and (4) they can proceed forward<br />

rather quickly because, in certain cases, they have either received or initiated NYISO and/or <strong>New</strong> <strong>York</strong><br />

Public Service Commission (PSC) approval. The estimated total investment for these projects is $ 385<br />

million. The projects included in this category are:<br />

1. 3 rd Leeds - Pleasant Valley 345kV Line<br />

2. Marcy South Series Compensation and Fraser - Coopers Corners Reconductoring<br />

3. 2 nd Rock Tavern to Ramapo 345kV Line<br />

Actionable Projects<br />

Actionable Projects also provide a broad range of benefits, however, these projects have not<br />

advanced as far as the Immediately Actionable Projects in terms of detailed engineering evaluations<br />

and regulatory approval. In addition, this set of projects leverage the Immediately Actionable Projects<br />

to fully realize their benefits. The estimated total investment for these projects is $ 1.72 billion. 8 The<br />

projects included in this category are:<br />

1. Marcy – <strong>New</strong> Scotland 345 kV Line<br />

2. 3 rd <strong>New</strong> Scotland – Leeds 345 kV Line<br />

3. Oakdale – Fraser 345 kV Line Upgrade<br />

4. Moses – Marcy 230 kV to 345 kV Upgrade<br />

Projects to Address Potential Indian Point/Downstate Generation Retirement<br />

This group of actionable projects is primarily beneficial in addressing reliability concerns stemming<br />

from the retirement of downstate generation, including the potential retirement of the Indian Point<br />

generation facilities. The start time of these projects would be advanced so that they would be ready<br />

as the needs materialize. The estimated total investment for these projects is $ 370 million. The<br />

projects included in this category are:<br />

1. <strong>Transmission</strong> to Un-bottle Staten Island Generation<br />

2. East Garden City - <strong>New</strong>bridge 345 kV Upgrade<br />

8 Of this estimated amount, $714 million represents the level of currently anticipated investment that will be made by the NY<br />

Transco. The remaining $1.0 billion investment represents the replacement of certain existing transmission assets within the<br />

proposed projects by the host NYTO.<br />