Bennett-Howard-Bath-Montour Falls 115 kV Line Reconductoring<br />
Project to Enable Wind Generation<br />
Project Description:<br />
Reconductor the existing 115 kV line from Bennett Substation to Howard Substation to Bath Substation to<br />
Montour Falls Substation with a conductor sized to no less than double 1033 ACSR or equivalent (2500A<br />
summer normal). The existing line extends from the City of Hornell (Steuben County) to the Village of<br />
Montour Falls (Schuyler County). All terminals of the project are located in NYISO Zone C.<br />
Project Size:<br />
Length: 42.5 miles<br />
Voltage: 115kV<br />
Anticipated rating (summer normal): 2500 A<br />
Terminal Stations and required upgrades:<br />
The terminal substations are Bennett, Howard, Bath, and Montour Falls. The 115 kV breakers and CT’s at<br />
Bennett and the 115 kV buswork, switches, and CT’s at Bath and Montour Falls Substations will need to be<br />
upgraded to match the capacity of the 2-1033 ACSR conductor.<br />