New York Transmission Company - Energy Highway
New York Transmission Company - Energy Highway
New York Transmission Company - Energy Highway
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Montour Falls - Hillside 115 kV Line Reconductoring<br />
Project to Enable Wind Generation<br />
Project Description:<br />
Reconductor the two existing 115 kV lines (963 and 978) from Montour Falls Substation to Hillside<br />
Substation with a conductor sized to no less than double 1033 ACSR or equivalent (2500A summer<br />
normal). The existing line extends from Village of Montour Falls (Schuyler County) to the City of Elmira<br />
(Chemung County). All terminals of the project are located in NYISO Zone C.<br />
Project Size:<br />
Length: 16 miles<br />
Voltage: 115kV<br />
Anticipated rating (summer normal): 2500A<br />
Terminal Stations and required upgrades:<br />
The terminal substations are Montour Falls and Hillside. The 115 kV buswork, switches and current<br />
transformers at Montour Falls and Hillside Substations will need to be upgraded to match the capacity of<br />
the 2-1033 ACSR conductor.<br />
40