Canandaigua - Hillside and Hillside - Watercure Road 230 kV Lines Reconfiguration<br />

Project to Address Potential Indian Point/Downstate Generation Retirement<br />

Project Description:<br />

Currently, the Hillside-Canandaigua and Hillside-Watercure Road 230 kV lines are on 6 double circuit<br />

towers as they exit Hillside Substation. To eliminate the potential double circuit outage, one of these<br />

towers needs to be reconfigured to reduce the total number of double circuit towers from 6 to 5. The<br />

double circuit towers are located in the City of Elmira (Chemung County). All terminals of the project are<br />

located in NYISO Zone C.<br />

Project Size:<br />

There is no change in line length, voltage or rating. This is simply a separation of 1 of the 230 kV double<br />

circuit towers as the 68 and 69 lines exit Hillside Substation.<br />

Terminal Stations and required upgrades:<br />

None required.<br />