isk assessments or undertake any fur<strong>the</strong>r seismic work. While <strong>the</strong> hospital building<br />

has been considered most at risk, and funds were previously budgeted <strong>for</strong> retr<strong>of</strong>it,<br />

<strong>the</strong> funds are no longer available due to <strong>the</strong> State’s fiscal crisis. Because <strong>of</strong> its<br />

mixed use <strong>for</strong> clinics, labs and residences, <strong>Lanterman</strong>’s hospital building is not<br />

subject to <strong>the</strong> Cali<strong>for</strong>nia hospital seismic retr<strong>of</strong>it compliance date <strong>of</strong> 2013 (SB 1953<br />

Chapter 740, 1994 and SB 1661 Chapter 679, Statutes <strong>of</strong> 2006) because it is not<br />

technically categorized as a hospital; but it is still at risk and subject to Nursing<br />

Facility seismic requirements. The building would require mandatory seismic<br />

updating if <strong>the</strong>re were to be any major renovation in <strong>the</strong> building that exceeded 25%<br />

<strong>of</strong> <strong>the</strong> replacement value <strong>of</strong> <strong>the</strong> building. While <strong>the</strong> Vanir Study estimated<br />

<strong>Lanterman</strong> seismic upgrades at a total cost <strong>of</strong> $1.2 million in 1998, <strong>the</strong> most recent<br />

DGS estimate <strong>for</strong> <strong>the</strong> cost <strong>of</strong> seismic retr<strong>of</strong>it <strong>of</strong> <strong>the</strong> hospital building alone was<br />

approximately $42.5 million.<br />

• Americans with Disabilities Act (ADA) Compliance: <strong>Lanterman</strong> was evaluated<br />

<strong>for</strong> ADA compliance as part <strong>of</strong> an assessment funded by <strong>the</strong> Department and<br />

conducted through DGS and its contractor, Carter Burgess, in 2002-2003. Carter<br />

Burgess worked with <strong>Lanterman</strong> to identify <strong>the</strong> scope <strong>of</strong> work necessary to achieve<br />

minimum compliance and developed a plan with phased projects that would be<br />

completed over three fiscal years, beginning in 2007. The total cost <strong>of</strong> <strong>the</strong> work was<br />

projected at approximately $20.6 million in 2006 dollars. The construction project<br />

could never be funded and <strong>the</strong> major work remains unaddressed, although<br />

<strong>Lanterman</strong> has completed some curb cuts, ramps, sidewalk repairs and o<strong>the</strong>r small<br />

ADA upgrades using $102,429 in special repair funding over <strong>the</strong> past five years.<br />

• Kitchen and Food Service Deficiencies: The Vanir Study found that <strong>of</strong> <strong>the</strong> five<br />

developmental centers assessed, <strong>Lanterman</strong>’s main kitchen was in need <strong>of</strong> <strong>the</strong> most<br />

structural modifications, equipment repairs, and equipment and structural<br />

replacements. Most <strong>of</strong> <strong>Lanterman</strong>’s food service facilities and equipment were<br />

found to be antiquated and non-compliant with codes. Special constraints in some<br />

<strong>of</strong> <strong>the</strong> residence kitchens precluded adequate refrigeration and preparation <strong>of</strong> food<br />

products. The lack <strong>of</strong> air conditioning contributed to an unacceptable work<br />

environment and improper food temperatures. Walk-in refrigerators and freezers<br />

needed replacement and did not consistently maintain correct temperatures or meet<br />

code. Hot food equipment also did not consistently maintain proper temperatures.<br />

In addition, serious seismic issues were identified. While <strong>the</strong> seismic retr<strong>of</strong>its have<br />

been completed, <strong>the</strong> structural issues that negatively impact safety, sanitation, and<br />

proper food preparation, handling, and storage have not been corrected because <strong>of</strong><br />

<strong>the</strong> unavailability <strong>of</strong> funds. <strong>Lanterman</strong> has replaced some equipment and worked to<br />

maintain sanitary conditions to <strong>the</strong> degree possible within existing funds, and has<br />

met federal certification requirements annually in this area but <strong>the</strong> 1948 kitchen is<br />

inadequate <strong>for</strong> today’s needs and code requirements. While <strong>the</strong> Vanir Study<br />

estimated kitchen repairs at $2.9 million in 1998, replacement <strong>of</strong> <strong>the</strong> kitchen and<br />

renovation <strong>of</strong> <strong>the</strong> satellite kitchens could cost in <strong>the</strong> neighborhood <strong>of</strong> $50 million<br />

today, based on <strong>the</strong> Department’s recent experience with similar projects.<br />

28