Sunshine Coast Aquatic Plan 2011-2026 - Sunshine Coast Council
Sunshine Coast Aquatic Plan 2011-2026 - Sunshine Coast Council
Sunshine Coast Aquatic Plan 2011-2026 - Sunshine Coast Council
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Table 13: Desired provision standards<br />
Type Facility style/elements<br />
Community Community pools represent community<br />
owned and managed aquatic assets<br />
which contribute towards improved service<br />
provision within the aquatic network.<br />
District<br />
(minor)<br />
This facility is of a size and location which<br />
services a whole district accommodating<br />
the majority of aquatic needs and<br />
programs within a district area. This can<br />
consist of a lap swimming pool, heated<br />
pool and other ancillary infrastructure<br />
based on district needs. Seasonal<br />
operation may be considered.<br />
District<br />
(major)<br />
Providing for a higher number of users<br />
than a minor district facility capable of<br />
attracting a diverse range of user groups<br />
catering for all program requirements<br />
including leisure water. Major facilities will<br />
draw a large number of users from a wide<br />
radius and will be required to be of high<br />
standard. Year round operation.<br />
Regional Providing for a higher number of users<br />
than district and in particular can cater for<br />
swimming events to a regional level and<br />
has the infrastructure to provide space<br />
for regional water polo and diving activity<br />
demands.<br />
Provision<br />
considerations<br />
Existing aquatic facilities<br />
available for community<br />
use are located at:<br />
Pomona, Cooroy,<br />
Conondale, Maleny,<br />
Tewantin, Kenilworth,<br />
Mooloolah, Mountain<br />
Creek.<br />
Consider provision<br />
through aquatic facilities<br />
at the following locations:<br />
► Buderim, Coolum/<br />
Peregian, Eumundi,<br />
Palmwoods and<br />
Palmview.<br />
► ► Maleny is being<br />
considered through<br />
a separate planning<br />
process.<br />
Consider provision within<br />
the principal and major<br />
activity centres of:<br />
► Beerwah, Caloundra<br />
South, Caloundra,<br />
Nambour, Noosa and<br />
Maroochydore/Cotton<br />
Tree.<br />
To be provided within the<br />
major activity centre of:<br />
► Kawana.<br />
*Development can be staged<br />
Population catchment<br />
ratios<br />
Water<br />
space<br />
(approx)<br />
Site area<br />
(approx)<br />
Annual<br />
Patronage<br />
Target (APT)<br />
Must demonstrate<br />
significant localised<br />
community patronage<br />
or benefit and do not<br />
reduce the viability of<br />
the publicly accessible<br />
aquatic facilities within<br />
the region.<br />
n/a n/a n/a<br />
Approx 1: 20,000<br />
un-serviced population<br />
Notional catchment<br />
area 5 km (primary) and<br />
10 km (secondary)<br />
500 m 2 10,000 m 2<br />
minimum<br />
Approx<br />
60,000<br />
persons p.a.<br />
Approx catchment<br />
1:50,000 un-serviced<br />
Notional catchment area<br />
10 km<br />
1,500 m 2 15,000 m 2 Approx<br />
200,000<br />
persons p.a.<br />
Approx: 1: Region wide 2,000 m 2 20,000 m 2 > 200,000<br />
persons p.a.<br />
►<br />
►<br />
►<br />
62 <strong>Sunshine</strong> <strong>Coast</strong> <strong>Aquatic</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>2026</strong>