<strong>University</strong> <strong>of</strong> Massachusetts Lowell Campus Transportation Plan<br />

In Spring 2011, South Campus lots were full during typical weekdays with<br />

the exception <strong>of</strong> the Wilder Faculty/Staff parking lot. The 250-space<br />

overflow lot (s<strong>of</strong>tball field) typically reached capacity during weekday peak<br />

periods. In Fall 2011, following the addition <strong>of</strong> the 700-space 1001<br />

Pawtucket overflow lot, the overflow lot in South Campus has not been<br />

used because first-year commuter students are required to park at 1001<br />

Pawtucket.<br />

East Campus has some reserve parking capacity; however, it is not located<br />

near the main academic facilities and therefore not fully utilized despite the<br />

capacity issues on the other <strong>campus</strong>es.<br />

Future Parking Projections<br />

Future parking demand projections were made based on future on-<strong>campus</strong><br />

housing projections and student population growth over the next five<br />

years. The detailed analysis is presented in the Appendix.<br />

North and South Garages, there appears to be sufficient parking through<br />

the Fall 2014/Spring 2015 academic year <strong>campus</strong> wide, but a shortfall on<br />

North Campus, based on current enrollment projections. The <strong>campus</strong><br />

experiences an overall deficit based on current enrollment projections <strong>of</strong><br />

approximately 100 spaces by Fall 2015. This suggests the minimum target<br />

for mode change to be accomplished by this <strong>plan</strong>.<br />

A sensitivity analysis was conducted to understand the impact <strong>of</strong> delaying<br />

construction <strong>of</strong> South Garage for one or two years. If the opening <strong>of</strong> South<br />

Garage does not occur until Fall 2014, the South Campus will experience a<br />

deficiency <strong>of</strong> approximately 330 spaces, while the <strong>campus</strong> as a whole will<br />

have a deficiency <strong>of</strong> approximately 50 spaces in Fall 2013. If opening <strong>of</strong><br />

South Garage does not occur until Fall 2015, the South Campus will<br />

experience a deficiency <strong>of</strong> approximately 430 spaces and the <strong>campus</strong> as a<br />

whole will have a deficiency <strong>of</strong> 428 spaces in Fall 2014. The corresponding<br />

Future parking supply was estimated based on the current parking supply<br />

with anticipated changes due to:<br />

••<br />

Construction on existing surface parking lots for other <strong>University</strong> uses<br />

(e.g. Eames Lot)<br />

••<br />

Overflow parking facilities coming on and <strong>of</strong>f line<br />

••<br />

Addition <strong>of</strong> parking facilities through leasing and/or acquisition<br />

••<br />

New construction <strong>of</strong> parking facilities<br />

It was assumed that North Garage (650 spaces; currently in construction)<br />

and South Garage (currently in design, approximately 720 spaces) will be<br />

built on their respective <strong>campus</strong>. These parking supply assumptions are<br />

identified in Figure 10 and detailed in analysis in the Appendix.<br />

Figure 10 shows the change in demand (solid line) and supply (dotted line)<br />

for each <strong>campus</strong> and at UMass Lowell as a whole. After the construction <strong>of</strong><br />

Proposed North Garage, perspective<br />

18<br />

Vanasse Hangen Brustlin, Inc.