Technical Specification - UNDP
Technical Specification - UNDP
Technical Specification - UNDP
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
14.11 GLAZING TO WOOD - WITH BEADS .........................................................................................<br />
14.12 GLAZING TO METAL - WITHOUT BEADS ..................................................................................<br />
14.13 GLAZING TO METAL - WITH BEADS ........................................................................................<br />
14.14 GLAZING WITHOUT PUTTY .....................................................................................................<br />
14.15 MIRRORS ................................................................................................................................<br />
14.16 CLEANING ETC. .......................................................................................................................<br />
14.17 MEASUREMENT &PAYMENT...................................................................................................<br />
15 PAINTING AND DECORATION .................................................................................................<br />
15.1 GENERALLY ............................................................................................................................<br />
15.2 MATERIALS ............................................................................................................................<br />
15.3 INTERNAL PLASTER, FAIR FACED CONCRETE AND BLOCK WORK ...........................................<br />
15.4 CEILING BOARDS ETC. ............................................................................................................<br />
15.5 STEELWORKS INCLUDING WINDOWS, LOUVERS, ETC. INTERNALLY AND EXTERNALLY. .........<br />
15.6 EXPOSED SERVICE PIPES.........................................................................................................<br />
15.7 WOODWORK REQUIRED TO BE PAINTED .................................................................................<br />
15.8 WOODWORK REQUIRED TO BE STAINED AND VARNISHED. ...................................................<br />
15.9 INTERNAL PLASTER ................................................................................................................<br />
15.10 CEILING BOARDS ETC. ............................................................................................................<br />
15.11 UNPLASTERED CONCRETE OR BLOCK WORK ..........................................................................<br />
15.12 STEELWORKS AND EXPOSED SERVICE PIPES ..........................................................................<br />
15.13 WOODWORK REQUIRED TO BE PAINTED AS FOR STEELWORKS. .............................................<br />
15.14 WOODWORK REQUIRED TO BE STAINED AND VARNISHED ......................................................<br />
15.15 EXTERNAL RENDERING ..........................................................................................................<br />
15.16 GRANULATE WORKS ..............................................................................................................<br />
15.17 MEASUREMENT AND PAYMENT: .............................................................................................<br />
15.18 PAINTING WORKS: ..................................................................................................................<br />
15.19 POLYCARBONATE WORKS: .....................................................................................................<br />
15.19.1 Forming ........................................................................................................................<br />
15.19.2 Thermoforming: ...........................................................................................................<br />
15.19.3 Pre-drying conditions: .................................................................................................<br />
15.19.4 Thermoforming with P.E. Masking: .............................................................................<br />
15.19.5 Thermoforming Palsun Mirror and Reflective P.C.: ...................................................<br />
15.19.6 Fabricating ...................................................................................................................<br />
15.19.7 Bonding ........................................................................................................................<br />
15.19.8 Cleaning and Finishing ................................................................................................<br />
15.19.9 Painting ........................................................................................................................<br />
15.19.10 Chemical Resistance ....................................................................................................<br />
15.20 MEASUREMENT AND PAYMENT ..............................................................................................<br />
16 ROADWAY LIGHTING ................................................................................................................<br />
16.1 GENERAL ................................................................................................................................<br />
16.2 REFERENCE STANDARDS ........................................................................................................<br />
16.3 CABLE INSTALLATION ............................................................................................................<br />
17 LOW VOLTAGE FLEXIBLE POWER CABLES FOR CONVENTIONAL LIGHTING<br />
COLUMNS AND LUMINARIES ...........................................................................................................<br />
17.1 GENERAL ................................................................................................................................<br />
17.2 CONDUCTORS .........................................................................................................................<br />
17.3 INSULATION ............................................................................................................................<br />
17.4 SHEATH ..................................................................................................................................<br />
17.5 SPECIFICATION FOR MID-HINGED MAST ................................................................................<br />
17.6 LOW VOLTAGE FLEXIBLE POWER CABLE FOR MID-HINGED HIGH MASTS .............................<br />
17.7 RAISING/LOWERING CROWN HIGH MAST ...............................................................................<br />
17.7.1 Lighting Requirements ......................................................................................................<br />
17.7.2 Flood Lighting Masts ........................................................................................................<br />
17.7.3 Flood Light Luminaries <strong>Specification</strong> ...............................................................................<br />
17.8 AVIATION LIGHT ....................................................................................................................<br />
17.9 LIGHTING BENEATH OVER-BRIDGES ......................................................................................<br />
17.10 GANTRY SIGNS ILLUMINATION ...............................................................................................<br />
17.11 LAMPS ....................................................................................................................................<br />
l