Fifteen)<br />

Sealing & Drumming of Cables<br />

−<br />

−<br />

−<br />

Before dispatch, the manufacturer shall cap the ends of all cables so as to form<br />

a seal to prevent the ingress of water during transportation and installation.<br />

All cables shall be delivered to site with the manufacturer's seals, labels or<br />

other proof of origin intact.The labels and seals shall be retained for inspection<br />

by the Engineer.<br />

Each drum length of cable shall be allotted a distinctive and separate reference<br />

number. This number shall appear on the Test Sheets covering the respective<br />

length of cable and shall also be clearly marked on the cable drum. All cables<br />

shall be capped on the drum to prevent the ingress of water.<br />

16.3 Cable Installation<br />

1- General<br />

One) The arrangements of cables and all methods of installation shall be subject to<br />

approval by the Engineer.<br />

Two) Cables shall be installed in one length from terminal point to terminal point.<br />

The radius of each bend or change in direction of the route of any cable shall<br />

not be less than the IEE Regulations, the relevant BS specifications, or the<br />

cable manufacturer's recommendations, whichever is the greater.<br />

Three) Multi-core cables carrying alternating current for three phase working shall be<br />

laid strictly in accordance with the IEE Regulations.<br />

Four) The Contractor shall lay in the trench along with the power cable a single core<br />

copper earthing cable of not less than 16 sq.mm diameter for 4x16, 4x25 and<br />

4x35 sq.mm dia, 25 sq.mm for 4x50 sq.mm dia and 35 sq.mm for 4x70 sq.mm<br />

dia power cables respectively. The earthing cable shall run all the way from<br />

the feeder pillar to the last column on each circuit. Looping of the earthing<br />

cable shall be made inside each column.<br />

2- Cables Laid Directly in the Ground<br />

One)<br />

Two)<br />

Three)<br />

Four)<br />

The Contractor shall excavate trenches along approved cable routes to the<br />

minimum depths shown on the detailed drawings.<br />

All loose rock, stones and other sharp materials shall be removed from the<br />

trench.<br />

The Contractor shall supply washed sieved sand and cable warning tapes. He<br />

shall supply and lay these materials along the trench route as specified in the<br />

drawings.<br />

The Contractor shall lay, level and compact clean sand in the bottom of the<br />

trench to a depth of 75 mm before laying the cables. After laying the cables he<br />

shall then cover them with a further 75 mm of clean sand, level and compact.<br />

The backfilling of the trench, including the laying of PVC warning tape, shall<br />

then be completed in accordance with the specifications.<br />