statutory <strong>report</strong>ing/<br />
Statutes enacted, repealed and amended during <strong>2006</strong><br />
Statute 1.1 Preliminary Amended<br />
Statute 2.1 Elections to Council Amended<br />
Statute 9.14<br />
10. Conformity with the<br />
Building Act 1993<br />
Major projects (new and existing<br />
building works)<br />
The following mechanisms have<br />
been implemented to ensure that<br />
new buildings and works on existing<br />
buildings conform with building<br />
standards:<br />
• Property and Campus Services closely<br />
examine each major project prior to<br />
the selection <strong>of</strong> a project team.<br />
• The selected design consultants for<br />
each project are <strong>University</strong>-registered<br />
or Department <strong>of</strong> Infrastructureregistered<br />
consultants.<br />
The Howard Florey Institute <strong>of</strong><br />
Experimental Physiology and Medicine<br />
Amended<br />
Statute 9.17 Murdoch Children’s Research Institute Amended<br />
Statute 9.27 Hawthorn Institute <strong>of</strong> Education Limited Repealed<br />
Statute 9.52<br />
The Australia and New Zealand School<br />
<strong>of</strong> Government Limited<br />
Enacted<br />
Statute 9.53 The Brain Research Institute Enacted<br />
Statute 9.54 The Austin Research Institute Enacted<br />
Statute 10.4 Foundations Repealed<br />
Statute 11.2 Enrolment – General Provisions Amended<br />
Statute 11.5 Unsatisfactory Progress Repealed and<br />
re-enacted<br />
Statute 12.1 Examiners Amended<br />
Statute 13.1 Student Discipline Amended<br />
Statute 14.1 Intellectual Property Amended<br />
• All design and management <strong>of</strong> project<br />
works is undertaken in accordance<br />
with the <strong>University</strong>’s Project<br />
Management and Design Manual.<br />
The Manual has been developed<br />
to advise consultants <strong>of</strong> the<br />
management procedures and design<br />
standards required by the <strong>University</strong><br />
and includes procedures covering<br />
environmental and ccupational health<br />
and safety matters.<br />
• The <strong>University</strong> has promulgated<br />
procedures similar to those required<br />
by the private sector for the issue <strong>of</strong><br />
building permits.<br />
• Where required by the Building Code<br />
<strong>of</strong> Australia, an external building<br />
surveyor is appointed for each project<br />
to give advice regarding planning and<br />
building permits, certification <strong>of</strong> final<br />
inspection and occupancy permits.<br />
• The <strong>University</strong> ensures that an<br />
asbestos audit is carried out for each<br />
project prior to the commencement <strong>of</strong><br />
construction work.<br />
• All projects are monitored by the<br />
<strong>University</strong> project managers and<br />
appointed consultants, in order to<br />
ensure that the projects comply<br />
with current building regulations and<br />
statutory requirements.<br />
• The Project Management Procedures<br />
Manual is used by <strong>University</strong> project<br />
managers to ensure that <strong>University</strong><br />
policy and procedures are followed<br />
in relation to works.<br />
• Sixty-seven projects, each<br />
with a value <strong>of</strong> more than $50,000,<br />
were completed in <strong>2006</strong>. Each project<br />
was carried out in accordance with<br />
building regulations and statutory<br />
requirements.<br />
• An Occupancy Permit or certificate<br />
<strong>of</strong> Final Inspection is obtained for<br />
every project for which there is a<br />
building permit.<br />
In addition, 21 projects were not<br />
subject to Certification <strong>of</strong> Plans or<br />
Building Surveyor involvement during<br />
construction.<br />
These included:<br />
• Infrastructure upgrades (nine)<br />
• Equipment upgrades (two)<br />
• Minor works (10)<br />
None <strong>of</strong> these projects come within the<br />
jurisdiction <strong>of</strong> the conformity with the<br />
Building Act 1993 or required structural<br />
change necessitating building surveyor<br />
inspections.<br />
The <strong>University</strong> <strong>of</strong> <strong>Melbourne</strong> Annual Report <strong>2006</strong><br />