22.10.2014 Views

annual report/2006 - University of Melbourne

annual report/2006 - University of Melbourne

annual report/2006 - University of Melbourne

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

statutory <strong>report</strong>ing/<br />

Statutes enacted, repealed and amended during <strong>2006</strong><br />

Statute 1.1 Preliminary Amended<br />

Statute 2.1 Elections to Council Amended<br />

Statute 9.14<br />

10. Conformity with the<br />

Building Act 1993<br />

Major projects (new and existing<br />

building works)<br />

The following mechanisms have<br />

been implemented to ensure that<br />

new buildings and works on existing<br />

buildings conform with building<br />

standards:<br />

• Property and Campus Services closely<br />

examine each major project prior to<br />

the selection <strong>of</strong> a project team.<br />

• The selected design consultants for<br />

each project are <strong>University</strong>-registered<br />

or Department <strong>of</strong> Infrastructureregistered<br />

consultants.<br />

The Howard Florey Institute <strong>of</strong><br />

Experimental Physiology and Medicine<br />

Amended<br />

Statute 9.17 Murdoch Children’s Research Institute Amended<br />

Statute 9.27 Hawthorn Institute <strong>of</strong> Education Limited Repealed<br />

Statute 9.52<br />

The Australia and New Zealand School<br />

<strong>of</strong> Government Limited<br />

Enacted<br />

Statute 9.53 The Brain Research Institute Enacted<br />

Statute 9.54 The Austin Research Institute Enacted<br />

Statute 10.4 Foundations Repealed<br />

Statute 11.2 Enrolment – General Provisions Amended<br />

Statute 11.5 Unsatisfactory Progress Repealed and<br />

re-enacted<br />

Statute 12.1 Examiners Amended<br />

Statute 13.1 Student Discipline Amended<br />

Statute 14.1 Intellectual Property Amended<br />

• All design and management <strong>of</strong> project<br />

works is undertaken in accordance<br />

with the <strong>University</strong>’s Project<br />

Management and Design Manual.<br />

The Manual has been developed<br />

to advise consultants <strong>of</strong> the<br />

management procedures and design<br />

standards required by the <strong>University</strong><br />

and includes procedures covering<br />

environmental and ccupational health<br />

and safety matters.<br />

• The <strong>University</strong> has promulgated<br />

procedures similar to those required<br />

by the private sector for the issue <strong>of</strong><br />

building permits.<br />

• Where required by the Building Code<br />

<strong>of</strong> Australia, an external building<br />

surveyor is appointed for each project<br />

to give advice regarding planning and<br />

building permits, certification <strong>of</strong> final<br />

inspection and occupancy permits.<br />

• The <strong>University</strong> ensures that an<br />

asbestos audit is carried out for each<br />

project prior to the commencement <strong>of</strong><br />

construction work.<br />

• All projects are monitored by the<br />

<strong>University</strong> project managers and<br />

appointed consultants, in order to<br />

ensure that the projects comply<br />

with current building regulations and<br />

statutory requirements.<br />

• The Project Management Procedures<br />

Manual is used by <strong>University</strong> project<br />

managers to ensure that <strong>University</strong><br />

policy and procedures are followed<br />

in relation to works.<br />

• Sixty-seven projects, each<br />

with a value <strong>of</strong> more than $50,000,<br />

were completed in <strong>2006</strong>. Each project<br />

was carried out in accordance with<br />

building regulations and statutory<br />

requirements.<br />

• An Occupancy Permit or certificate<br />

<strong>of</strong> Final Inspection is obtained for<br />

every project for which there is a<br />

building permit.<br />

In addition, 21 projects were not<br />

subject to Certification <strong>of</strong> Plans or<br />

Building Surveyor involvement during<br />

construction.<br />

These included:<br />

• Infrastructure upgrades (nine)<br />

• Equipment upgrades (two)<br />

• Minor works (10)<br />

None <strong>of</strong> these projects come within the<br />

jurisdiction <strong>of</strong> the conformity with the<br />

Building Act 1993 or required structural<br />

change necessitating building surveyor<br />

inspections.<br />

The <strong>University</strong> <strong>of</strong> <strong>Melbourne</strong> Annual Report <strong>2006</strong><br />

81

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!