Toyota South Africa Sustainability Report 2008 - Automotiveonline ...
Toyota South Africa Sustainability Report 2008 - Automotiveonline ...
Toyota South Africa Sustainability Report 2008 - Automotiveonline ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Sustainability</strong> <strong>Report</strong>_14-10-<strong>2008</strong>:Layout 1 10/14/08 2:45 PM Page 20<br />
The requirements of this system include:<br />
TMC Consolidated EMS Requirements<br />
Jointly adopt the <strong>Toyota</strong> Earth Charter and<br />
draft individual environmental policies<br />
In production, set quantitative goals and<br />
follow up on those goals<br />
In sales, create an environmental management<br />
system; reduce environmental impact, make<br />
social contributions, and carry out environmental<br />
communication in line with the nature of<br />
business. In FY2006 begin quantitative<br />
management of environmental impact such as<br />
CO2 emissions during logistics activities<br />
Implement top level environmental responses based<br />
on actual conditions in each country and region<br />
<strong>Toyota</strong> <strong>South</strong> <strong>Africa</strong> Response<br />
Achieved ISO14001 certification of <strong>Toyota</strong><br />
Production (Durban) and <strong>Toyota</strong> Marketing<br />
(Sandton)<br />
Paint Line 3 has been introduced to address<br />
production shortfalls, and simultaneously<br />
reduce the environmental footprint of<br />
production, with regards to energy, water,<br />
CO 2 , VOCs and waste<br />
Quantitative monitoring underway;<br />
baselines established for primary emissions;<br />
logistics baseline studies underway.<br />
• Established SAEC<br />
• <strong>Toyota</strong> Action Plan<br />
100% of the vehicles produced by <strong>Toyota</strong> <strong>South</strong> <strong>Africa</strong> are subject to the Consolidated<br />
EMS. In 2007, a variety of internal and external audits of the EMS helped to identify<br />
opportunities for continuous improvement. These audits were carried out by:<br />
conducted by the <strong>South</strong> <strong>Africa</strong>n Bureau of Standards (SABS).<br />
Mitigation of Environmental Impacts<br />
in Products and Services<br />
<strong>Toyota</strong>‘s environmental considerations<br />
go beyond production issues, and<br />
address the full life cycle of the vehicles<br />
produced. We aim to spread our<br />
philosophy of harmonious living across<br />
our suppliers, to our customers, and to<br />
other stakeholders with whom we<br />
engage in the course of our work. The<br />
table below highlights the key areas on which we focus our efforts to reduce our<br />
environmental footprint.<br />
Suppliers and Dealers <strong>Toyota</strong> <strong>South</strong> <strong>Toyota</strong> <strong>South</strong> <strong>Africa</strong> Products<br />
<strong>Africa</strong> Production Services including CSR<br />
ISO14001 VOC Education Energy<br />
implementation<br />
efficient vehicles<br />
DERAP Water Community and Replacing vehicle<br />
ECO 1, 2, 3 environment clean- parts with<br />
ups<br />
recycled materials<br />
Reduced transport Energy Community health Driver training<br />
from Suppliers: CO 2<br />
• <strong>Toyota</strong> Motor Corporation<br />
• The <strong>Toyota</strong> <strong>South</strong> <strong>Africa</strong> SHE Department<br />
• eThekwini Waste Water<br />
• The third party certification group BVQI<br />
The Sandton office was certificated to ISO14001 for the first time in 2007. Re-certification<br />
of the Prospecton plant to ISO 14001 is planned for another three years, with the<br />
re-certification audit to be undertaken in November <strong>2008</strong>. External certification will be<br />
Parts<br />
SOC-free (Pb, Cd, Hg,<br />
cr6+)<br />
Packaging, waste<br />
CO 2 Production &<br />
Production Logistics<br />
<strong>Toyota</strong> EMS<br />
ISO14001: 2004<br />
20