27.10.2014 Views

Toyota South Africa Sustainability Report 2008 - Automotiveonline ...

Toyota South Africa Sustainability Report 2008 - Automotiveonline ...

Toyota South Africa Sustainability Report 2008 - Automotiveonline ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Sustainability</strong> <strong>Report</strong>_14-10-<strong>2008</strong>:Layout 1 10/14/08 2:45 PM Page 22<br />

A Continuously Variable Transmission (CVT) can provide better fuel economy by allowing<br />

the engine to run at its most efficient revolutions per minute (RPM) for a range of vehicle<br />

speeds. This technology is used in the Prius (1.5l).<br />

Variable Valve Timing (VVT-i) is a technology developed by <strong>Toyota</strong>, which varies the<br />

timing of the intake valves. Dual VVT-i adjusts both intake and exhaust camshafts.These<br />

engines significantly reduce hydrocarbon emissions.<br />

Meeting European Emissions Standards<br />

European emission standards define the limits for exhaust emissions of new vehicles<br />

sold in EU member states. Successive European directives progressively introduce<br />

increasingly stringent standards. The stages are typically referred to as Euro 1, Euro 2,<br />

Euro 3, Euro 4 and Euro 5 fuels for Light Duty Vehicle standards. Currently, emissions of<br />

nitrogen oxide (NOx), hydrocarbons (HC), carbon monoxide (CO) and particulate matter<br />

(PM) are regulated for most vehicle types. <strong>Toyota</strong> sales that meet the various stages are<br />

reflected below.<br />

Special Story<br />

In 2007, the Weld Plant at the Prospecton site undertook a major energy saving drive,<br />

under the theme of Environmental and Global Warming. Their aim within a two-year<br />

period was to replace all the high-energy lights of 400W each with low energy<br />

fluorescent tubes, and to ensure that unnecessary lights were not used. They achieved<br />

this – along with a monthly energy saving in the weld plant of 7,455 kWh – within 18<br />

months, through the removal, replacement or disabling of a total of 961 400-watt bulbs.<br />

FY’06<br />

FY’07<br />

EURO 0 10,697 8,254<br />

EURO 2 82,527 62,043<br />

EURO 4 55,992 77,159<br />

Grand Total 149,261 147,456<br />

The Weld Plant team.<br />

Budgeting and Planning<br />

As part of our drive to integrate environmental considerations into everything we do,<br />

no single “environmental budget” is compiled for our operations. Each department is<br />

responsible for capital expenditure, operational expenditure and maintenance budgets<br />

for environmental performance. Thus no consolidated figure can be reported for <strong>Toyota</strong><br />

<strong>South</strong> <strong>Africa</strong>.<br />

22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!