01.11.2014 Views

NI 43-101 Technical report, Surface diamond drilling ... - Iamgold

NI 43-101 Technical report, Surface diamond drilling ... - Iamgold

NI 43-101 Technical report, Surface diamond drilling ... - Iamgold

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

R a r e E a r t h E l e m e n t E x p l o r a t i o n P r o g r a m M a r c h - 2 0 1 3<br />

W i n t e r - S u m m e r 2 0 1 2 P a g e | 110<br />

Item 21. INTERPRETATION AND CONCLUSIONS<br />

21.1 Geological compilation:<br />

The large 2012 <strong>drilling</strong> program bring new geological information about the REE zone. A<br />

complete compilation of the historical data was done in 2011 and not repeated in 2012. The<br />

new data was merged into the global data base. In the well-known Saint-Honoré carbonatite<br />

complex context, the anterior version of the geological model was judged enough realistic for<br />

the purpose of this <strong>report</strong>. The geological model will be actualised in 2013 by interpreting<br />

the high definition magnetic survey and the new <strong>drilling</strong> information.<br />

The 2012 definition program focused on the carbonatite complex. The REE mineralization is<br />

limited to the REE Zone which corresponds to the central core of the carbonatite complex.<br />

The main REE minerals are: bastnaesite and synchysite, both disseminated in the<br />

ferrocarbonatite. It is accompanied with hematitic and /or chloritic alteration in the breccia<br />

facies but also find as centimetre scale, reddish coloured clusters in the massive facies. The<br />

change of textures, from breccia to massive, are often but the mineralisation contain is<br />

homogeneous.<br />

21.2 Drilling<br />

IAMGOLD <strong>drilling</strong> 2012 campaign (33 holes totalling 23, 851 m) tested the REE zone to a<br />

vertical depth of 1,200 m. This <strong>drilling</strong> campaign, defined the tridimensional shape of the<br />

REE zone, detailed the resources model and proved the mineralization continuity down to<br />

±1,200m.<br />

It is important to notice that this <strong>drilling</strong> campaign used a N031°grid orientation (to keep the<br />

same orientation as the mine grid) and completed a 100m X 100m grid down to 350m below<br />

surface. From 350m to 700m, the <strong>drilling</strong> grid is spaced to 100m x 200m. This new spacing<br />

allowed to transform the 2011 inferred resources into indicated resource and stretched the<br />

grade interpolation at depth.<br />

The 2012 drill campaign, drill core handling, logging and sampling protocols were improved<br />

and are according to conventional industry standards and conform to generally accept best<br />

practices.<br />

21.3 Mineral resources estimation – REE zone<br />

This <strong>report</strong> include a new resource estimate based on 2012 REE exploration and definition<br />

update. The <strong>drilling</strong> added in 2012 increased the confidence level of the block model<br />

interpolation and double the resource estimation compared to last year. The REE resource<br />

corresponds to an enriched zone of REEs mineral which is characteristic of this annular<br />

carbonatite type.<br />

3400, chemin du Columbium, St-Honoré-de-Chicoutimi, QC G0V 1L0 Canada – tel. : 418 673-4694 Fax : 418 673-3179<br />

E-mail : info.niobec@iamgold.com www.niobec.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!