01.11.2014 Views

NI 43-101 Technical report, Surface diamond drilling ... - Iamgold

NI 43-101 Technical report, Surface diamond drilling ... - Iamgold

NI 43-101 Technical report, Surface diamond drilling ... - Iamgold

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

R a r e E a r t h E l e m e n t E x p l o r a t i o n P r o g r a m M a r c h - 2 0 1 3<br />

W i n t e r - S u m m e r 2 0 1 2 P a g e | 35<br />

Figure 12: Mineralized carbonatite breccia facies (BRC1L).<br />

The REE mineralisation presented no relationship with the different facies of the core REE<br />

zone. Several analyses cumulate during the 2011 and 2012 <strong>drilling</strong> program show the<br />

homogeneity of the mineralization inside the ferrocarbonatite (C1) envelope. The low grade<br />

zone, are localized in the periphery and correspond to the transition zone. In this zone, the<br />

REE mineralisation is still in the C1 facies. The amount of mineralized C1 intruding the<br />

adjacent lithology (C2, C3, C5 and S1) decreased going outward from the center.<br />

Item 12. EXPLORATION<br />

Exploration and resource development <strong>drilling</strong> is concentrated within the carbonatite complex<br />

where the economic concentration of niobium is known. Since 1985, no exploration works<br />

for REE have been done until the <strong>drilling</strong> campaign started by IAMGOLD in 2011 and<br />

continues through 2012.<br />

12.1 Scoping Study<br />

Exploration program focused on the REE zone. The <strong>drilling</strong> program has continuously<br />

progressed. The delimitation program, initiated in 2011, ended in May 4 th 2012 by the<br />

completion of the hole 2012-REE-039. A total of 10 holes were added in 2012 to the initial<br />

28 holes performed in 2011, including two deep holes (2012-REE-033and 2012-REE-034),<br />

for a total of 22, 072 linear metres.<br />

12.2 Prefeasibility study<br />

Since May 5th, 10 other holes have been added to define the REE zone over a 100 x 100<br />

metres <strong>drilling</strong> grid through the depth of 400 metres and a 100x200 metres <strong>drilling</strong> grid<br />

through the depth of 700 metres. The additional 15, 779 linear metres drilled between May to<br />

3400, chemin du Columbium, St-Honoré-de-Chicoutimi, QC G0V 1L0 Canada – tel. : 418 673-4694 Fax : 418 673-3179<br />

E-mail : info.niobec@iamgold.com www.niobec.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!