NI 43-101 Technical report, Surface diamond drilling ... - Iamgold
NI 43-101 Technical report, Surface diamond drilling ... - Iamgold
NI 43-101 Technical report, Surface diamond drilling ... - Iamgold
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
R a r e E a r t h E l e m e n t E x p l o r a t i o n P r o g r a m M a r c h - 2 0 1 3<br />
W i n t e r - S u m m e r 2 0 1 2 P a g e | 35<br />
Figure 12: Mineralized carbonatite breccia facies (BRC1L).<br />
The REE mineralisation presented no relationship with the different facies of the core REE<br />
zone. Several analyses cumulate during the 2011 and 2012 <strong>drilling</strong> program show the<br />
homogeneity of the mineralization inside the ferrocarbonatite (C1) envelope. The low grade<br />
zone, are localized in the periphery and correspond to the transition zone. In this zone, the<br />
REE mineralisation is still in the C1 facies. The amount of mineralized C1 intruding the<br />
adjacent lithology (C2, C3, C5 and S1) decreased going outward from the center.<br />
Item 12. EXPLORATION<br />
Exploration and resource development <strong>drilling</strong> is concentrated within the carbonatite complex<br />
where the economic concentration of niobium is known. Since 1985, no exploration works<br />
for REE have been done until the <strong>drilling</strong> campaign started by IAMGOLD in 2011 and<br />
continues through 2012.<br />
12.1 Scoping Study<br />
Exploration program focused on the REE zone. The <strong>drilling</strong> program has continuously<br />
progressed. The delimitation program, initiated in 2011, ended in May 4 th 2012 by the<br />
completion of the hole 2012-REE-039. A total of 10 holes were added in 2012 to the initial<br />
28 holes performed in 2011, including two deep holes (2012-REE-033and 2012-REE-034),<br />
for a total of 22, 072 linear metres.<br />
12.2 Prefeasibility study<br />
Since May 5th, 10 other holes have been added to define the REE zone over a 100 x 100<br />
metres <strong>drilling</strong> grid through the depth of 400 metres and a 100x200 metres <strong>drilling</strong> grid<br />
through the depth of 700 metres. The additional 15, 779 linear metres drilled between May to<br />
3400, chemin du Columbium, St-Honoré-de-Chicoutimi, QC G0V 1L0 Canada – tel. : 418 673-4694 Fax : 418 673-3179<br />
E-mail : info.niobec@iamgold.com www.niobec.com