NI 43-101 Technical report, Surface diamond drilling ... - Iamgold
NI 43-101 Technical report, Surface diamond drilling ... - Iamgold
NI 43-101 Technical report, Surface diamond drilling ... - Iamgold
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
R a r e E a r t h E l e m e n t E x p l o r a t i o n P r o g r a m M a r c h - 2 0 1 3<br />
W i n t e r - S u m m e r 2 0 1 2 P a g e | 124<br />
Were the nature of the quality control<br />
procedures adopted (e.g. standards, blanks,<br />
duplicates, external laboratory checks) of<br />
acceptable levels of accuracy (i.e. lack of<br />
bias) and precision?<br />
SAMREC-(Sect A:<br />
Criteria 6)<br />
SME-(Criteria B.3)<br />
Yes, Item 14-15 and 16<br />
LG, JFT<br />
1.7<br />
Verification of<br />
sampling and<br />
assaying<br />
Was there verification of significant<br />
intersections by either independent or<br />
alternative company personnel?<br />
Was there any use of twinned holes?<br />
CIM- (<strong>43</strong>-<strong>101</strong>-Item<br />
16)<br />
JORC- (Sect A:<br />
Criteria 7)<br />
SAMREC-(Sect A:<br />
Criteria 7)<br />
SME-(Criteria B.3)<br />
No<br />
LG, JFT<br />
No<br />
LG, JFT<br />
1.8<br />
Location of<br />
data points<br />
Were accurate and quality surveys used to<br />
locate drill holes (collar and down-hole<br />
surveys), trenches, mine workings and other<br />
locations used in Mineral Resource<br />
estimation? (Includes the quality and<br />
adequacy of topographic control.)<br />
CIM-(<strong>43</strong>-<strong>101</strong>-Item<br />
12)<br />
JORC- (Sect A:<br />
Criteria 8)<br />
Yes, Item 13, the<br />
topography surveys and<br />
drillhole collars are<br />
executed by surveyors.<br />
Surveys (Reflex) are<br />
performed by the dillng<br />
contractor and<br />
controlled by the<br />
Geology Department.<br />
LG, JFT<br />
SAMREC-(Sect A:<br />
Criteria 8)<br />
SME-(Criteria B.2)<br />
1.9<br />
Data spacing<br />
and<br />
distribution<br />
Has the data spacing of exploration results<br />
been denoted?<br />
Is the data spacing and distribution sufficient<br />
to establish the degree of geological and<br />
grade continuity appropriate for the Mineral<br />
Resource and Ore Reserve estimation<br />
procedure(s) and classifications applied?<br />
Has sample compositing been applied?<br />
CIM- (<strong>43</strong>-<strong>101</strong>-Item<br />
14)<br />
JORC- (Sect A:<br />
Criteria 9)<br />
SAMREC-(Sect B:<br />
Criteria 9)<br />
SME-(Criteria B.2)<br />
Yes, Item, 13,<br />
LG, JFT<br />
Yes, Item 13 and 19<br />
LG, JFT<br />
Yes, Item 19<br />
LG, JFT<br />
1.10<br />
Orientation of<br />
data in<br />
relation to<br />
geological<br />
structure<br />
Does the orientation of sampling achieve<br />
unbiased sampling of possible structures and<br />
has the extent to which this is known been<br />
denoted (considering the deposit type)?<br />
[If the relationship between the <strong>drilling</strong><br />
orientation and the orientation of key<br />
mineralized structures is considered to have<br />
introduced a sampling bias, this should be<br />
assessed and <strong>report</strong>ed if material.]<br />
CIM- (<strong>43</strong>-<strong>101</strong>-Items<br />
13&14)<br />
JORC- (Sect A:<br />
Criteria 10)<br />
SAMREC-(Sect B:<br />
Criteria 5)<br />
SME-(Criteria B.2)<br />
Yes, Item9-13 and 19,<br />
the data collect respect<br />
the homogenety of the<br />
ore body.<br />
LG, JFT<br />
No<br />
LG, JFT<br />
3400, chemin du Columbium, St-Honoré-de-Chicoutimi, QC G0V 1L0 Canada – tel. : 418 673-4694 Fax : 418 673-3179<br />
E-mail : info.niobec@iamgold.com www.niobec.com