01.11.2014 Views

NI 43-101 Technical report, Surface diamond drilling ... - Iamgold

NI 43-101 Technical report, Surface diamond drilling ... - Iamgold

NI 43-101 Technical report, Surface diamond drilling ... - Iamgold

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

R a r e E a r t h E l e m e n t E x p l o r a t i o n P r o g r a m M a r c h - 2 0 1 3<br />

W i n t e r - S u m m e r 2 0 1 2 P a g e | 113<br />

22.3 Drilling<br />

Below surface to 700 metres few drill holes crossed the inferred resources bottom line and<br />

demonstrated the continuity at depth of the mineralized zone at depth. An increasing of the<br />

REE mineral contain is visually observed and <strong>report</strong>ed by the assays. With the actual <strong>drilling</strong><br />

pattern, the geological property change, in the holes 2012-REE-033 and 2012-REE-034, may<br />

be considered local. Local grade variation can be observed in the well define upper level.<br />

Tighten the <strong>drilling</strong> mesh would confirmed the increasing grade with depth hypothesis or at<br />

leases confined the high grade zone.<br />

More <strong>drilling</strong> will be necessary to upgrade resources into reserves. A 50m x 50m <strong>drilling</strong><br />

mesh pattern could be tested. The underground access could provide an easy all year round<br />

access.<br />

3400, chemin du Columbium, St-Honoré-de-Chicoutimi, QC G0V 1L0 Canada – tel. : 418 673-4694 Fax : 418 673-3179<br />

E-mail : info.niobec@iamgold.com www.niobec.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!