NI 43-101 Technical report, Surface diamond drilling ... - Iamgold
NI 43-101 Technical report, Surface diamond drilling ... - Iamgold
NI 43-101 Technical report, Surface diamond drilling ... - Iamgold
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
R a r e E a r t h E l e m e n t E x p l o r a t i o n P r o g r a m M a r c h - 2 0 1 3<br />
W i n t e r - S u m m e r 2 0 1 2 P a g e | 130<br />
accuracy<br />
/confidence<br />
Resource estimate, as well as, the approach<br />
or procedure deemed appropriate by the<br />
Competent Person? [For example, the<br />
application of statistical or geostatistical<br />
procedures to quantify the relative accuracy<br />
of the resource within stated confidence<br />
limits, or, if such an approach is not deemed<br />
appropriate, a qualitative discussion of the<br />
factors which could affect the relative<br />
accuracy and confidence of the estimate.]<br />
Does the statement specify whether or not it<br />
relates to global or local estimates, and, if<br />
local, have the relevant tonnages or volumes,<br />
which should be relevant to technical and<br />
economic evaluation been stated?<br />
[Documentation should include assumptions<br />
made and the procedures used.]<br />
Have the statements of relative accuracy and<br />
confidence of the estimate been compared<br />
with production data, where available?<br />
JORC- (Sect C:<br />
Criteria 12)<br />
SAMREC-(Sect C:<br />
Criteria 8)<br />
SME-(Criteria F)<br />
LG, JFT<br />
Yes, Item 19-21,<br />
LG, JFT<br />
No,<br />
LG, JFT<br />
4.0 - Criteria for the Estimation and Reporting of Ore Reserves<br />
Item Criteria Essential Reporting Queries<br />
4.1<br />
Mineral<br />
Resource<br />
estimate for<br />
conversion to<br />
Ore Reserves<br />
4.2 Study Status<br />
Is there a description of the Mineral Resource<br />
estimate used as a basis for the conversion to<br />
an Ore Reserve?<br />
Is there a clear statement as to whether the<br />
Mineral Resources are <strong>report</strong>ed additional to,<br />
or inclusive of the Ore Reserves?<br />
Was the type and level of study undertaken to<br />
enable the conversion of Mineral Resources<br />
to Ore Reserves denoted?<br />
[The Codes do not require that a final<br />
feasibility study be undertaken to convert<br />
Mineral Resources to Ore Reserves, but it is<br />
required that appropriate studies have been<br />
carried out to determine a mine plan that is<br />
technically achievable and economically<br />
viable, and that all Modifying Factors have<br />
been considered.]<br />
Reserve<br />
Reporting<br />
Standards<br />
Reference<br />
CIM- (<strong>43</strong>-<strong>101</strong>-Item<br />
19)<br />
JORC- (Sect D:<br />
Criteria 1)<br />
SAMREC-(Sect D:<br />
Criteria 1)<br />
SME-(Criteria G)<br />
CIM- (<strong>43</strong>-<strong>101</strong>-Item<br />
19)<br />
JORC- (Sect D:<br />
Criteria 2)<br />
SAMREC-(Sect D:<br />
Criteria 1)<br />
SME-(Clause 13)<br />
Sign Off/Comment<br />
No, Item 19, no<br />
reserves are <strong>report</strong>ed,<br />
LG, JFT<br />
Yes, Item 19 and 21,<br />
LG, JFT<br />
Yes, Item 19, Studies<br />
on the geology and<br />
recovery are underway<br />
LG, JFT<br />
4.3<br />
Cut-off<br />
parameters<br />
Has the basis of the adopted cut-off grade(s)<br />
or the applied quality parameters been<br />
designated?<br />
CIM- (<strong>43</strong>-<strong>101</strong>-Item<br />
19)<br />
JORC- (Sect D:<br />
Criteria 3)<br />
yes, Item 19, the cut-off<br />
grade (0.5% TREO)<br />
was used only for the<br />
volumetric clculation<br />
LG, JFT<br />
3400, chemin du Columbium, St-Honoré-de-Chicoutimi, QC G0V 1L0 Canada – tel. : 418 673-4694 Fax : 418 673-3179<br />
E-mail : info.niobec@iamgold.com www.niobec.com