01.11.2014 Views

NI 43-101 Technical report, Surface diamond drilling ... - Iamgold

NI 43-101 Technical report, Surface diamond drilling ... - Iamgold

NI 43-101 Technical report, Surface diamond drilling ... - Iamgold

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

R a r e E a r t h E l e m e n t E x p l o r a t i o n P r o g r a m M a r c h - 2 0 1 3<br />

W i n t e r - S u m m e r 2 0 1 2 P a g e | 130<br />

accuracy<br />

/confidence<br />

Resource estimate, as well as, the approach<br />

or procedure deemed appropriate by the<br />

Competent Person? [For example, the<br />

application of statistical or geostatistical<br />

procedures to quantify the relative accuracy<br />

of the resource within stated confidence<br />

limits, or, if such an approach is not deemed<br />

appropriate, a qualitative discussion of the<br />

factors which could affect the relative<br />

accuracy and confidence of the estimate.]<br />

Does the statement specify whether or not it<br />

relates to global or local estimates, and, if<br />

local, have the relevant tonnages or volumes,<br />

which should be relevant to technical and<br />

economic evaluation been stated?<br />

[Documentation should include assumptions<br />

made and the procedures used.]<br />

Have the statements of relative accuracy and<br />

confidence of the estimate been compared<br />

with production data, where available?<br />

JORC- (Sect C:<br />

Criteria 12)<br />

SAMREC-(Sect C:<br />

Criteria 8)<br />

SME-(Criteria F)<br />

LG, JFT<br />

Yes, Item 19-21,<br />

LG, JFT<br />

No,<br />

LG, JFT<br />

4.0 - Criteria for the Estimation and Reporting of Ore Reserves<br />

Item Criteria Essential Reporting Queries<br />

4.1<br />

Mineral<br />

Resource<br />

estimate for<br />

conversion to<br />

Ore Reserves<br />

4.2 Study Status<br />

Is there a description of the Mineral Resource<br />

estimate used as a basis for the conversion to<br />

an Ore Reserve?<br />

Is there a clear statement as to whether the<br />

Mineral Resources are <strong>report</strong>ed additional to,<br />

or inclusive of the Ore Reserves?<br />

Was the type and level of study undertaken to<br />

enable the conversion of Mineral Resources<br />

to Ore Reserves denoted?<br />

[The Codes do not require that a final<br />

feasibility study be undertaken to convert<br />

Mineral Resources to Ore Reserves, but it is<br />

required that appropriate studies have been<br />

carried out to determine a mine plan that is<br />

technically achievable and economically<br />

viable, and that all Modifying Factors have<br />

been considered.]<br />

Reserve<br />

Reporting<br />

Standards<br />

Reference<br />

CIM- (<strong>43</strong>-<strong>101</strong>-Item<br />

19)<br />

JORC- (Sect D:<br />

Criteria 1)<br />

SAMREC-(Sect D:<br />

Criteria 1)<br />

SME-(Criteria G)<br />

CIM- (<strong>43</strong>-<strong>101</strong>-Item<br />

19)<br />

JORC- (Sect D:<br />

Criteria 2)<br />

SAMREC-(Sect D:<br />

Criteria 1)<br />

SME-(Clause 13)<br />

Sign Off/Comment<br />

No, Item 19, no<br />

reserves are <strong>report</strong>ed,<br />

LG, JFT<br />

Yes, Item 19 and 21,<br />

LG, JFT<br />

Yes, Item 19, Studies<br />

on the geology and<br />

recovery are underway<br />

LG, JFT<br />

4.3<br />

Cut-off<br />

parameters<br />

Has the basis of the adopted cut-off grade(s)<br />

or the applied quality parameters been<br />

designated?<br />

CIM- (<strong>43</strong>-<strong>101</strong>-Item<br />

19)<br />

JORC- (Sect D:<br />

Criteria 3)<br />

yes, Item 19, the cut-off<br />

grade (0.5% TREO)<br />

was used only for the<br />

volumetric clculation<br />

LG, JFT<br />

3400, chemin du Columbium, St-Honoré-de-Chicoutimi, QC G0V 1L0 Canada – tel. : 418 673-4694 Fax : 418 673-3179<br />

E-mail : info.niobec@iamgold.com www.niobec.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!