01.11.2014 Views

NI 43-101 Technical report, Surface diamond drilling ... - Iamgold

NI 43-101 Technical report, Surface diamond drilling ... - Iamgold

NI 43-101 Technical report, Surface diamond drilling ... - Iamgold

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

R a r e E a r t h E l e m e n t E x p l o r a t i o n P r o g r a m M a r c h - 2 0 1 3<br />

W i n t e r - S u m m e r 2 0 1 2 P a g e | 31<br />

Table 4: Paragenetic sequence for the REE Zone minerals (Fournier, 1993).<br />

MINERALS STAGE 1 STAGE 2 STAGE 4<br />

dolomite<br />

_______<br />

Ferroan dolomite __________________<br />

ankerite<br />

_______<br />

chlorite<br />

_______<br />

specularite<br />

_______<br />

synchisite<br />

___<br />

bastnaesite<br />

___<br />

monazite<br />

___<br />

pyrite<br />

____________________<br />

phlogopite<br />

___<br />

apatite<br />

___<br />

calcite<br />

___<br />

fluorite<br />

___<br />

barite<br />

____________<br />

hydrocarbon<br />

hematite<br />

_________________________<br />

sphalerite<br />

_____<br />

___<br />

11.2 REE mineralized envelope<br />

Considering the REE Zone drill holes compilation map (Figure 19), few drill holes were<br />

realized between 1967 and 1985 (totaling 3,902 m). The geometry of the mineralized<br />

envelope, draw as the geological core zone (C1), was principally based over the magnetic<br />

interpretation (Vallée & Dubuc, 1970).<br />

In 2011 and 2012, 37,370 metres were drilled by IAMGOLD-Niobec. Even if the REE zone<br />

limits were better defined by the new <strong>drilling</strong> program, the mineralized envelope roughly<br />

respected the first geological interpretation. The REE deposit have a spherical shape with a<br />

North-East elongation on plan view and cover an area at the sub-surface of about 1 km 2<br />

(Figure 5). The conical shape initially interpreted has changed to a more cylinder geometry<br />

down to 400m depth and was confirmed by the 100x100m <strong>drilling</strong> mesh. The 400m to 700m<br />

vertical axe is covered by a 100x200m <strong>drilling</strong> mesh. Based on this definition, the<br />

mineralized cylinder may be interpreted down to 700m with a high level of confidence. The<br />

deepest holes tested the mineralization continuity down to 1200m. Even if the lateral<br />

extensions are well confined, the core zone is still open at depth.<br />

The distribution of the overall TREO values (Total REE oxides) varied from 0.01% to<br />

12.34%. The overall average value is 1.75 % TREO. The interpreted high grade, >2%<br />

TREO, mineralized envelope (Figure 8) is associated to the brecciated and massive facies of<br />

the ferrocarbonatite.<br />

3400, chemin du Columbium, St-Honoré-de-Chicoutimi, QC G0V 1L0 Canada – tel. : 418 673-4694 Fax : 418 673-3179<br />

E-mail : info.niobec@iamgold.com www.niobec.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!