<strong>EuroMaint</strong> <strong>Rail</strong><br />
New interior for<br />
Arlanda Express<br />
designed by Björn Borg<br />
A-Train in collaboration with Björn Borg’s design team<br />
has produced a brand new interior for its trains – Arlanda<br />
Express. In summer <strong>2006</strong>, <strong>EuroMaint</strong> <strong>Rail</strong> was entrusted<br />
to carry out the refurbishment on the company’s seven<br />
train units.<br />
Light maintenance<br />
of Green Cargo’s<br />
freight carriages<br />
Since 1 January <strong>2006</strong>, <strong>EuroMaint</strong> <strong>Rail</strong> and Green<br />
Cargo have had a brand new contract structure<br />
for the maintenance of freight and mail wagons<br />
in northern Sweden. It is a minutely specified and<br />
regulated action-based contract.<br />
The refurbishment included strengthening the floors, new wall panels,<br />
new carpets and new seat upholstery. The challenge was to carry out<br />
the assignment swiftly in order to minimise disruption to rail services<br />
and the repercussions for passengers. The preparations took around<br />
six months.<br />
Tight schedule for work on each train<br />
The first of the seven train units was brought in for refurbishment in<br />
May. Following minor adjustments to the production plan, the other<br />
trains were brought in one by one during the off-peak summer period.<br />
The 25 people involved in the refurbishment had one week to complete<br />
work on each train. The refurbishment was carried out in tandem with<br />
ongoing maintenance to minimise the impact on services.<br />
“<strong>EuroMaint</strong> <strong>Rail</strong> and the other project participants planned and<br />
carried out the project in a professional manner, under strict requirements<br />
in terms of quality and schedule,” says Martin Byström, Vehicle<br />
Manager at A-Train.<br />
The contract, which runs until 1 March 2008, encompasses preventive<br />
and corrective maintenance of freight and mail wagons. The maintenance<br />
is carried out at our workshops in Luleå, Vännäs and Sundsvall. The<br />
contract also includes a high proportion of field service originating from<br />
these locations. A few of the mail wagons are maintained in Malmö and<br />
Hagalund. The contract provides approximately 25 work years.<br />
Knowledgeable client<br />
Green Cargo operates on a highly competitive market that places<br />
rigorous demands on careful cost control. Thanks to the company’s<br />
extensive knowledge of maintenance, they have been able to choose<br />
an action-based contract with strict delivery terms.<br />
Competitive supplier<br />
Some of our clearest competitive benefits are our established structure<br />
and organisation for maintenance of freight wagons, coupled<br />
with a tried and tested ability and capacity to carry out the requisite<br />
high volume of field maintenance. The result for our client is high<br />
availability of the wagon fleet combined with cost-effective maintenance.<br />
14