The vibration compacts the concrete and results in a very close<br />

indentation to the soil, improving the skin friction and bearing<br />

capacity.<br />

The usual needed time for set up and finishing the cycle<br />

for the installation of one vibrated cast in place pile does not<br />

exceed 20 to 30 minutes.<br />

Conclusion:<br />

Not one of these multiple and different load tests did<br />

result any negative outcome for vibrated piles. No factor of<br />

correction is required. The installation of the piling system at<br />

the Palm Paper site is the ultimate demonstration for the high<br />

performance of vibrated cast in place piles. All piles of 406<br />

mm diameter, a total of 97.221 running meter, were installed<br />

with two units of Liebherr Carriers LRB 255, equipped with<br />

ring vibrators type 32VMR, resulting an average of 19 piles<br />

per unit and per day. Within the same six months 2.010 piles<br />

of 610 mm diameter and 38.896 running meter were installed<br />

conventional, using four Hitachi /Fundex units with hydraulic<br />

hammers of 9 t drop weight resulting a low number of five piles<br />

per unit and per day.<br />

19 vibrated piles per day versus five piles installed conventional,<br />

theses numbers speak for themselves.<br />

Design and soils engineers in the deep foundation industry<br />

may consider vibrated cast in place piles as an equal way of<br />

installation. With their approval the pile driver contractors are<br />

able offering higher daily performance, reducing the total cost<br />

of the foundation. Standard of any installation of cast in place<br />

piles should be an exquisite Quality Control program, based<br />

Fig. 4: Liebherr Carrier LRB 255 with Ring Vibrator 32<br />

VMR; Photo BVV, Munich<br />

on high sophisticated machinery and equipment, permanent<br />

monitoring and recording of each pile installed and last not<br />

least: a well trained and motivated crew.<br />

References:<br />

BVV, Munich: ”<strong>Pile</strong> Load Tests, Kings Lynn, England”,<br />

Internal Investigation Report, Mars 2009. t<br />

BLAKESLEE • ARPAIA • CHAPMAN, INC.<br />

Engineered Construction Since 1844<br />

NEW & USED<br />

STEEL PIPE<br />

BRITTEX<br />

INTERNATIONAL<br />

PIPE SUPPLY<br />

Bridges and Dams<br />

Utilities and Substation<br />

Foundations<br />

Waterfront Structures<br />

Rigging and Millwrighting<br />

Underpinning & Shoring<br />

Blakeslee • Arpaia • Chapman, Inc.<br />

200 North Branford Road, Branford CT. O6443<br />

Phone: (203) 488-2500 Fax: (203) 488-4538<br />

Email: dchapman@bac-inc.com Web: www.bac-inc.com<br />

SERVICES<br />

• Weld to length<br />

• Fabrication<br />

• Cutting, beveling<br />

• Coating<br />

• Reconditioning<br />

• Roll and Weld<br />

• Sandblasting<br />

• Custom Orders<br />

PRODUCTS<br />

• New Prime<br />

• New Surplus<br />

• New Mill Reject<br />

• New Limited Service<br />

• Used and Secondary<br />

• Mill Overruns<br />

• Rolled and Welded<br />

• Spiral Welded<br />

We are a major supplier of steel<br />

pipe, specializing in custom orders.<br />

We supply pipe from 4” -108”<br />

diameter and also purchase new,<br />

used and structural pipe for<br />

inventory.<br />

...Any length,<br />

any size,<br />

call us!<br />

Brittex International Pipe Supply<br />

5505 Almeda Genoa Road • Houston, Texas 77048<br />

Tel: 713-991-6107 • Fax: 713-991-3128 • Web: www.brittexpipe.com<br />

• Q4 • 2009<br />

47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!