. Exhaust silencing.<br />

c. Transition piece from exhaust plenum to exhaust ducting.<br />

d. Exhaust stack [as per environmental protection requirement but not<br />

less than 50 m <strong>for</strong> GT with bypass damper and 50 m <strong>for</strong> HRSG].<br />

e. Hydraulic operated/controlled diverter damper<br />

f. Motor operated Guillotine damper<br />

g. Thermal insulation and lagging.<br />

h. The GT and HRSG Stacks shall be equipped with automatic<br />

Navigation lighting system<br />

Exhaust system shall be designed to enable the Combined Cycle Power Plant to<br />

run as Simple Cycle mode and Combined Cycle mode as well.<br />

6. Control Compartment (<strong>for</strong> GT)<br />

2.3 Mechanical System<br />

a. Outdoor enclosure.<br />

b. Turbine control panel.<br />

c. Generator control panel and protection panel.<br />

d. Motor control centre.<br />

e. Heating and air conditioning system.<br />

a. Piping between the on-base equipment and the <strong>of</strong>f-base equipment.<br />

b. Painting, including finished coat and special paints required <strong>for</strong> corrosion protection<br />

and high temperature resistance.<br />

c. Design, operation and maintenance manuals, including drawings.<br />

d. All other work necessary <strong>for</strong> the proper operation and maintenance <strong>of</strong> the gas<br />

turbine generating plant.<br />

e. Lubrication oil <strong>for</strong> flushing and <strong>for</strong> the initial filling.<br />

f. All lubricant and chemical additives.<br />

g. Natural gas handling facilities including gas metering and pressure regulating<br />

station.<br />

h. Overhead crane <strong>of</strong> proper capacity <strong>for</strong> heaviest piece <strong>of</strong> GTG & STG units.<br />

i. Closed Cycle cooling water and Circulating water system<br />

2.4 Electrical System<br />

a. One (1) lot : 6.6 KV switchgear.<br />

b. One (1) lot : 400 V power centre.<br />

c. One (1) lot : 400 V common motor control centre.<br />

d. One (1) lot : 400 V unit motor control centre .<br />

e. One (1) lot : 15.75 kv and 6.6 kv XLPE power cables.<br />

f. One (1) lot : Low voltage power cables.<br />

g. One (1) lot : Control and instrument cables.<br />

h. One (1) lot : Race way materials.<br />

i. One (1) lot : Grounding system.<br />

k. One (1) lot : 15.75 kV IPB<br />

2.5 Heat Recovery Steam Generator<br />

One (1) heat recovery steam generators <strong>of</strong> triple pressure (IP, LP, HP) steam cycle<br />

suitable to utilise exhaust gas from the gas turbine unit including followings.<br />

a. The steam drum and heat transfer sections which consist <strong>of</strong> the Economiser,<br />

Re-Powering <strong>Ghorasal</strong> 210 MW 3 rd <strong>Unit</strong> (Vol-2A <strong>of</strong> 2) 12