09.11.2014 Views

Tender Document for Repowering Project of Ghorasal 3rd Unit - BPDB

Tender Document for Repowering Project of Ghorasal 3rd Unit - BPDB

Tender Document for Repowering Project of Ghorasal 3rd Unit - BPDB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

maintenance <strong>of</strong> Gas Turbine Generating <strong>Unit</strong>, Steam Turbine Generating<br />

unit, HRSG and other plant equipment inclusive <strong>of</strong> routine, scheduled as<br />

well as emergency use that takes place in the course <strong>of</strong> operation <strong>of</strong> the<br />

plant during warranty period (24 months) which are mandatory. It may be<br />

mentioned that <strong>Tender</strong>er must quote in Schedule-F in full quantity and also<br />

additional items & quantity necessary as stated in <strong>Tender</strong> <strong>Document</strong>,<br />

otherwise <strong>Tender</strong> shall be rejected. During the warranty period <strong>of</strong> 24<br />

months, the Contractor shall supply all necessary equipment, spare parts,<br />

materials/consumables etc. at his own cost and whether it is listed or not in<br />

in Schedule-F, Vol. 2 <strong>of</strong> 2 Part B <strong>Tender</strong> <strong>Document</strong>s. In preparation <strong>of</strong> the<br />

list the tenderer have to consider plant factor as 80%. During the warranty<br />

period the Contractor have to conduct (providing all required spare parts<br />

and service) at least 1(One) CI <strong>for</strong> Gas Turbine and at least one Inspection<br />

<strong>for</strong> other equipment and any other maintenance work <strong>for</strong> <strong>for</strong>ce outage.<br />

Spare parts & consumables to be supplied <strong>for</strong> warranty period under the<br />

Contract must be made available at site be<strong>for</strong>e start <strong>of</strong> testing.<br />

2.26 Special Maintenance Tools<br />

The contractor shall provide all special tools including a boroscope set<br />

required <strong>for</strong> maintenance <strong>of</strong> the GTG <strong>Unit</strong>(s),GBC(s) and other equipments<br />

hand them over in good condition to the BOARD. A list <strong>of</strong> all such tools<br />

shall be incorporated with tender. Contractor shall not be permitted to use<br />

any equipment/ machinery/ tools, which are to be supplied under the Contract.<br />

2.27 Electrical workshop tools<br />

Current injection test set, Megger(HV: 2.5 to 6 KV, LV: 250V,500V,1000V),<br />

Multimeter, Level Gauge(600mm), Mega Ohmer(ZC-25B), Portable<br />

Millammeter(BMA-1), Mimmivoltmeter(BMV-1), Wire Buffing<br />

Machine, Hand Shares, Hydraulic Press(5 Ton), Pneumatic, Grease<br />

Gun, High Pressure Water Claener, Bearing Puller Kit, Bearing heater,<br />

Pistol Drill(medium), Temperature Probe, Power Meter Set(Include: Phase<br />

Rotation Meters, AC&DC Ammeters), Micrometers(Small, Medium and<br />

Large), Hydrometer, Tachometers, Hydraulic Crimpers, Insulating Oil<br />

Tester, Heat Gun, Portable Air blower, Portable Vacuum Cleaner,<br />

Ladder(Medium), Drawing, Consumable, Equipment Storage<br />

Cabinets(suitable sizes), Work Benches, Hand Equipment Trolley, Power<br />

Frequency LV, SF6 Gas Detector, Loss Factor Meter, Primary Current<br />

Protection Injection test Set etc.<br />

2.28 Machine Shop equipment & Tools- Deleted<br />

Laboratory Equipment (Testing Bench):<br />

Pressure Meter (0-60 kgl m 2 ), Temperature Meter (0-150 0 C-PT50, 0-150 0<br />

C-PT100)<br />

2.29 Chemical laboratory with standard apparatus <strong>for</strong> Combined cycle<br />

Power Plant<br />

Necessary laboratory instruments, glass wares, laboratory test reagents<br />

essential <strong>for</strong> the process control and quality control <strong>of</strong> the Chemical plant<br />

shall be supplied by the contractor as per needs<br />

Re-Powering <strong>Ghorasal</strong> 210 MW 3 rd <strong>Unit</strong> (Vol-2A <strong>of</strong> 2) 28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!