2. Scope <strong>of</strong> Work<br />

2.0 Scope <strong>of</strong> work<br />

2.1 Combined Cycle Power Plant<br />

2.1.1 General<br />

2.2 Gas Turbine Generating unit (Simple Cycle)<br />

2.2.1 General<br />

2.2.2 Gas Turbine Generating unit (Simple Cycle)<br />

2.3 Mechanical System<br />

2.4 Electrical System<br />

2.5 Heat Recovery Steam Generator<br />

2.6 Overhauling <strong>of</strong> Existing Steam Turbine Generating <strong>Unit</strong>, its auxiliaries &<br />

power evacuation facilities<br />

2.6.1 Steam Turbine<br />

2.6.2 Governing System<br />

2.6.3 Condenser cooling system<br />

2.6.4 Feed water system<br />

2.6.5 Lube oil system<br />

2.6.6 Condensate water system<br />

2.6.7 Dereator<br />

2.6.8 Heater (L.P, I.P, H.P)<br />

2.6.9 Steam Ejector<br />

2.6.10 Circulating water pumps (CWP)<br />

2.6.11 Valves<br />

2.6.12 Generator<br />

2.6.13 Generator excitation system<br />

2.6.14 Trans<strong>for</strong>mer (<strong>Unit</strong> step up trans<strong>for</strong>mer)<br />

2.6.15 Protection system<br />

2.6.16 Battery/ DC system<br />

Re-Powering <strong>Ghorasal</strong> 210 MW 3 rd <strong>Unit</strong> (Vol-2A <strong>of</strong> 2) 6