RE-POWERING PROJECT OF GHORASAL 3 RD UNIT<br />

TECHNICAL REQUIREMENTS<br />

1.1 DESCRIPTION OF THE PROJECT:<br />

Re-Powering <strong>of</strong> <strong>Ghorasal</strong> 3 rd <strong>Unit</strong> with inclusion <strong>of</strong> GTG and HRSG having configuration <strong>of</strong><br />

2:2:1 (Two GTG + Two HRSG + one existing STG) at Site conditions (35 0 C, 1.013 mbar,<br />

98% R.H.) is intended to be set up by Bangladesh Power Development Board at<br />

<strong>Ghorasal</strong>, Narsingdi, Bangladesh. Approx. 17 acres <strong>of</strong> land is allocated <strong>for</strong> implementation<br />

<strong>of</strong> this project. Natural Gas will be used as fuel <strong>of</strong> this Power Plant.<br />

The Gas turbine(s) shall be equipped with the bypass stacks and diverter dampers to<br />

allow continuous and reliable simple cycle operation.<br />

The proposed Plant will be installed in the land as Shown in the site layout. The <strong>Project</strong><br />

will be implemented on turnkey basis.<br />

The Power Station step-up trans<strong>for</strong>mers would be connected with the 230 kV Power Plant<br />

Sub-Station through underground cable and other necessary electrical equipment as<br />

shown in the single line diagram.<br />

Short-circuit and ground-fault current <strong>of</strong> <strong>Ghorasal</strong> 230 kV Grid Sub-station.<br />

MVA BASE MVA 3-PHASE MVA PHASE-GND<br />

........ 12123 13605<br />

The following parameters are to be considered in plant design:<br />

Sub-Tropical Monsoon.<br />

Temperature: 5 0 C to 45 0 C.<br />

Relative Humidity: 36% to 100%.<br />

Annual Rain Fall: 120 cm to 345 cm.<br />

Wind Velocity: 200 km/hr.<br />

Seismic Horizontal ground Acceleration: 0.2 g.<br />

Other parameters (e.g. soil & water to be analysed by the <strong>Tender</strong>er at his<br />

own cost) as per <strong>Tender</strong> Requirement.<br />

The project may be classified into the following broad areas. Details are<br />

however given later in the scope <strong>of</strong> work.<br />

1. Survey preparation <strong>of</strong> drawing, land development, landscaping <strong>of</strong> the<br />

proposed site.<br />

2. The supply and construction <strong>of</strong> the Power plant equipment.<br />

3. Equipping <strong>of</strong> 230 kV material/equipment at the Power Plant Sub-Station<br />

as per single line diagram enclosed.<br />

4. Supply and Construction <strong>of</strong> all civil work <strong>for</strong> a power station complete in<br />

all respect.<br />

5. Supply and construction <strong>of</strong> entire Gas Fuel system <strong>for</strong> the plant, fire<br />

protection system etc.<br />

Re-Powering <strong>Ghorasal</strong> 210 MW 3 rd <strong>Unit</strong> (Vol-2A <strong>of</strong> 2) 4